38
Checks to be made on delivery
WARNING! Dispose of the packaging in
appropriate collection points.
The Jupiter unit comes packaged in a wooden case or fixed
on a pallet and wrapped in transparent film.
Check that the delivery is complete and inform the carrier of
any damage to the unit which may be attributed too careless
or inappropriate transportation. Check, in particular, any
eventual damage to the panel in which the user terminal
is mounted.
Lifting and moving the unit must be carried out by a
mechanical lifter.
the following must be container within the packaging:
•
The Jupiter unit;
•
JupiterUse and Installation Manual;
•
Jupiter unit electrical diagrams;
•
Jupiter unit cooling circuit diagrams;
•
Jupiter unit installation diagrams;
•
List of spare parts;
•
CE declaration with a list of the European standards to
which the machine must conform;
•
guarantee conditions.
Unloading the unit
to unload the unit from the pallet, carry out the following
procedure:
•
move the pallet as near as possible to where the unit
is to be installed;
•
use a ramp to avoid any damage to the unit during
unloading;
•
remove the blocking screws which fix the unit to the
pallet;
•
carefully push the unit along the ramp until it reaches
the floor.
Characteristics of the installation area
WARNING! The unit must be installed internally
and protected from adverse conditions.
the unit is predisposed to be installed on raised access
flooring using mounting frames or appropriate floor stands
supplied on request from TRANE. However, the upflow units
(upwards air flow) with air intake through the rear or front
can be installed also on floors which are not raised.
the area of installation must have the following
characteristics:
•
make sure to leave a 700mm clearence (distance D)
in front of the unit once it has been fitted. Check that
air intake and discharge connections are not blocked
in any way, not even partially;
•
a horizontal and even floor;
•
the electrical energy distribution system has been
produced in respect of Cei standards, suitable for the
characteristics of the unit;
•
a cold water distribution implant (if a humidifier is to be
installed);
•
implant for connection to the condensing unit;
•
external air outlet (if a fresh air intake is to be
installed);
•
for the refrigerating gas drain see paragraph “Connection
to gas drain”;
•
condensing drain circuit and/or humidifier.
WARNING! The preparation of the installation
area must be carried out as indicated in the
installation drawing attached to the machine
documentation.
Positioning of the unit
WARNING! If the surface where the unit is placed
is not even and horizontal there, is a risk of an
overflow from the condensation tray.
Installation on raised access flooring
Installation on raised access flooring occurs by means of a
mounting frame. the frame enables the installation of the
unit before the raised floor is installed, increased absorption
of noise and vibrations and the facilitation of connecting
pipes and cables.
The up flow models (upwards air flow) with rear or frontal air
intake may be installed without using the mounting frame.
41
42
41
42
43
44