17
Installazione
Funzionamento
Manutenzione
Unità ad alta precisione Jupiter
Unità a espansione diretta
JDAC / JUAC / JDAV / JUAV / JDWC / JUWC / JDWV / JUWV
Taglie: 0115 – 0125 – 0133 – 0135 – 0150 – 0160
Unità ad acqua refrigerata
JDCC / JUCC / JDCV / JUCV
Taglie: 0020 – 0025 – 0030 – 0040 – 0060
PKG-SVX24B-IT
Installation of the mounting frame
To install the unit on raised flooring using the mounting
frame, carry out the following procedures:
•
a flexible seal at least 5 mm thick should be fitted
between the raised floor panels and the mounting frame
which should also be isolated from the metallic floor
structure;
•
position the unit of the mounting frame and fix it using
the M8 screw inserts found on the base of the unit.
Installation on flooring which is not raised
Installation on flooring which is not raised can occur without
using bases, but only on upflow models (upwards air flow)
with rear or frontal air intake. Installation on this type of floor
does not require any additional operation besides that of
normal positioning.
Installation of the floor stand
To install the unit on the floor stand, carry out the following
procedures:
•
position the unit on the floor stand;
•
fix the unit to the floor stand using the M8 screw inserts
found on the base of the unit.
Opening and removal of the front panel
to open and remove the front panel proceed as follows:
•
rotate the closing blocks, as indicated by the arrows,
by one quarter of a turn;
•
firmly grip the panel;
•
lift and tilt away from the unit until complete
extraction.
JU**
JD**
43
44
Base of unit
Floor stand