Following the guidelines listed below will enhance both the
installation and operation of the furnace.
Note:
In the absence of local codes, the installation must
conform with the American National Standard Z223-
1a of the National Fuel Gas Code, (latest edition).
1. To assure sufficient gas pressure at the unit, use
as a guide to determine the appropriate gas pipe size
for the unit heating capacity listed on the unit
nameplate.
Note:
Supply line size should not be sized smaller than
the factory piping connection elbow size.
2. If a gas line already exists, verify that it is sized large
enough to handle the additional furnace capacity
before connecting to it.
3. Take all branch piping from any main gas line from the
top at 90 degrees or at 45 degrees to prevent moisture
from being drawn in with the gas.
4. Ensure that all piping connections are adequately
coated with joint sealant and properly tightened. Use a
piping compound that is resistant to liquid petroleum
gases.
5. Provide a drip leg near the unit.
6. Install a pressure regulator at the unit that is adequate
to maintain 7" w.c. for natural gas (or 11" w.c. for
propane) while the furnace is operating at full capacity.
Important:
Gas pressure in excess of 14" w.c. or 0.5
psig will damage the gas train.
NOTICE
Gas Valve Damage!
Failure to follow instructions below could result in
gas valve damage from incorrect gas pressures,
irregular pulsating flame patterns, burner rumble, and
potential flame outages.
Use a pressure regulator to properly regulate gas
pressure. DO NOT oversize the regulator.
Failure to use a pressure regulating device will result in
incorrect gas pressure, which can cause erratic
operation due to gas pressure fluctuations as well as
damage the gas valve. Oversizing the regulator will
cause irregular pulsating flame patterns, burner rumble,
potential flame outages, and possible gas valve
damage.
If a single pressure regulator serves more than one
rooftop unit, it must be sized to ensure that the inlet gas
pressure does not fall below 7" w.c. for natural gas (10"
w.c. for propane) with all the furnaces operating at full
capacity. The gas pressure must not exceed 14" w.c.
when the furnaces are off.
7. Provide adequate support for all field installed gas
piping to avoid stressing the gas train and controls.
WARNING
Explosion Hazard!
Failure to follow safe leak test procedures below
could result in death or serious injury or equipment or
property-only-damage.
Never use an open flame to detect gas leaks. Use a
leak test solution for leak testing.
8. Leak test the gas supply line using a soap-and-water
solution or equivalent before connecting it to the gas
train.
9. Check the supply pressure before connecting it to the
unit to prevent possible gas valve damage and the
unsafe operating conditions that will result.
Note:
Do not rely on the gas train shutoff valves to
isolate the unit while conducting gas pressure/
leak test. These valves are not designed to
withstand pressures in excess of 14" w.c. or 0.5
psig.
Summary of Contents for IntelliPak with Symbio 800
Page 64: ...64 RT SVX063G EN Figure 37 Dry bulb changeover map Startup the Unit ...
Page 137: ...RT SVX063G EN 137 Notes ...
Page 138: ...138 RT SVX063G EN Notes ...
Page 139: ...RT SVX063G EN 139 Notes ...