notification and true start date to Trane (or an agent of
Trane specifically authorized to perform startup).
Additional Requirements for Units
Requiring Disassembly
When a new fully assembled IntelliPak is shipped and
received from our Trane manufacturing location, and,
for any reason, it requires disassembly or partial
disassembly, which could include but is not limited to
the evaporator, condenser, control panel, compressor/
motor, factory mounted starter, or any other
components originally attached to the fully assembled
unit, compliance with the following is required to
preserve the factory warranty:
•
Trane, or an agent of Trane specifically authorized
to perform start-up and warranty of Trane
®
products, will perform or have direct on-site
technical supervision of the disassembly and
reassembly work.
•
The installing contractor must notify Trane, or an
agent of Trane specifically authorized to perform
start-up and warranty of Trane
®
products, two
weeks in advance of the scheduled disassembly
work to coordinate the disassembly and
reassembly work.
•
Start-up must be performed by Trane or an agent of
Trane specifically authorized to perform start-up
and warranty of Trane
®
products.
Trane, or an agent of Trane specifically authorized to
perform startup and warranty of Trane
®
products, will
provide qualified personnel and standard hand tools to
perform the disassembly work at a location specified
by the contractor. The contractor shall provide the
rigging equipment, such as chain falls, gantries, cranes,
forklifts, etc., necessary for the disassembly and
reassembly work and the required qualified personnel
to operate the necessary rigging equipment. See
“Warranty and Liability Clause,” p. 138
for additional
details.