61
Index
A
AC Conductors...32;
See Table 5
Air Handling Equipment...55
Air Vents...24
Align the mounting holes...19
B
Balancing Valves...24
C
C20 Ton Unit Dimensional Data...12;
See Figure 2
C25 Ton Unit Dimensional Data...13;
See Figure 2
C30 Ton Unit Dimensional Data...14;
See Figure 2
C40 Ton Unit Dimensional Data...15;
See Figure 2
C50 Ton Unit Dimensional Data...16;
See Figure 2
C60 Ton Unit Dimensional Data...17;
See Figure 2
Cautions...4
chiller drain...24
Chiller Flow Switch...24
Circulating Pump Interlock...32
clearance adjustments...19
Clearance Requirements Around Water Pipe...25;
See
Figure 7C
“COILOX”...56
Compressor Circuit Breaker Data...54;
See Table 12
Compressor Circuit Breakers...7
Compressor Crankcase Heaters ...51
compressor discharge service valve...38
Compressor Inhibit / KW Limit...33
Compressor Lockout...7
Compressor Module...5
Compressor Motor Winding Thermostats...7
Compressor Nameplate...4
Compressor Oil...51
Compressor Shipping Hardware...22;
See Figure 6
concealed damage...10
Condenser Coil Data...55;
See Table 14
Condenser Fan Control...43
Condenser Fan Locations...48;
See Figure 15
condensing temperature rises above the “lower limi...6
Condensing Unit...55
Connection Diagram Notes...37
Connection Wire Range...29;
See Table 3
Control for Comfort Applications...40
Control for Ice Building...40
Control for Process Applications...41
Current Sensing Module...5
D
DC Conductors...33;
See Table 6
discharge pressure approaches 405 ± 7 psig...6
discharge pressure decreases to approximately
300...6
Drain Plug...24
E
Edge Protector...25;
See Figure 7B
“efficiency check point” setting...6
Electrical Service Sizing Data...31
Emergency Stop...8
Evaporator Nameplate...4
Evaporator Data...44;
See Table 9
Evaporator water inlet and outlet types...23
Evaporator Water-Pressure Drop...45;
See Figure 13
External Auto/Stop...8, 32
F
factory mounted disconnect switch...28
Field Control Connections Diagram;
See Figure 12A
Field Installed Power Wiring...29;
See Figure 11
Flow Control Interlock...32
Flow Switch Interlock...8
flushing water piping...26
Freeze Protection...40
Freeze Protection Diagnostic...40
Fuse Replacement Data...54;
See Table 13
G
GBAS 0 - 10 Volt Connections Diagram;
See Figure 12C
GBAS 0 - 5 Volt Connections Diagram;
See Figure 12B
General Unit Requirement...38
Generic Building Automation System...5
H
Head Pressure Control...6
Heat Tape Installation...27;
See Figure 10: Table 2A:
Table 2B
High Pressure Controls...6
Hot Gas Bypass...43
Hot Operation...7
Hot Start...7
Human Interface Module...5
I
Ice Building Control...33
ICS™ Communication Link...33
Installation Clearances...11
Interprocessor Communications Board...5
L
“Layout” and “Shipwith”...9
Lead-Lag...6, 43
Leaving Solution Reset...41
Level the unit...19
LonTalk Communication Interface Module...5
Loss of Flow (Refrigerant)...6
Summary of Contents for IntelliPak CG-SVX02B-EN
Page 10: ...10 General Information Module Mounting Locations Screw Hole...
Page 12: ...12 Figure 1 Typical Installation Clearances for Single Multiple or Pit Applications...
Page 13: ...13 Figure 2 C20 Ton Unit Dimensional Data Recommended Clearances...
Page 14: ...14 Figure 2 C25 Ton Unit Dimensional Data Recommended Clearances...
Page 15: ...15 Figure 2 C30 Ton Unit Dimensional Data Recommended Clearances...
Page 16: ...16 Figure 2 C40 Ton Unit Dimensional Data Recommended Clearances...
Page 17: ...17 Figure 2 C50 Ton Unit Dimensional Data Recommended Clearances...
Page 18: ...18 Figure 2 C60 Ton Unit Dimensional Data Recommended Clearances...
Page 35: ...35...
Page 36: ...36 Figure 12B Typical GBAS 0 5 Volt Connections Diagram...
Page 37: ...37...
Page 38: ...38...
Page 63: ...63...
Page 64: ......