23
Installation
Shipping Fasteners
Compressor Shipping Hardware
Figure 6 illustrates the location of each tiedown bolt and
rubber isolator bolt for the compressor assembly in each
circuit. Refer to the illustration and the following discussion
to locate and remove the fasteners.
Two Manifolded Compressors
Each manifolded compressor assembly is rigidly bolted to a
mounting rail assembly. The rail assembly sets on four (4)
rubber isolators. The assembly is held in place by two ship-
ping braces that secure each compressor assembly rail to
the unit’s base rail. To remove the shipping hardware, follow
the procedures below:
1. Remove the four anchor bolts (2 front and 2 rear), used
to secure the shipping brace to the unit’s base rail.
2. Remove the three self-tapping screws that secure each
shipping brace to the compressor mounting rails.
3. Remove and discard the two 30-1/2" long shipping
braces for each assembly.
4. Do not remove the shipping plate located on top of the
compressors.
5. Ensure that the compressor rail assembly is free to move
on the rubber isolators.
Figure 6
Removing C20 through C60 Scroll Compressor Shipping Hardware
Summary of Contents for IntelliPak CG-SVX02B-EN
Page 10: ...10 General Information Module Mounting Locations Screw Hole...
Page 12: ...12 Figure 1 Typical Installation Clearances for Single Multiple or Pit Applications...
Page 13: ...13 Figure 2 C20 Ton Unit Dimensional Data Recommended Clearances...
Page 14: ...14 Figure 2 C25 Ton Unit Dimensional Data Recommended Clearances...
Page 15: ...15 Figure 2 C30 Ton Unit Dimensional Data Recommended Clearances...
Page 16: ...16 Figure 2 C40 Ton Unit Dimensional Data Recommended Clearances...
Page 17: ...17 Figure 2 C50 Ton Unit Dimensional Data Recommended Clearances...
Page 18: ...18 Figure 2 C60 Ton Unit Dimensional Data Recommended Clearances...
Page 35: ...35...
Page 36: ...36 Figure 12B Typical GBAS 0 5 Volt Connections Diagram...
Page 37: ...37...
Page 38: ...38...
Page 63: ...63...
Page 64: ......