Trane Startup Checklist
This checklist is intended to be a guide for the Trane
technician just prior to unit 'startup'. Many of the
recommended checks and actions could expose the
technician to electrical and mechanical hazards. Refer
to the appropriate sections in the this manual for
appropriate procedures, component specifications and
safety instructions.
IIm
mp
po
orrtta
an
ntt:: This checklist is not intended as a
substitution for the contractor’s installation
instruction.
IIm
mp
po
orrtta
an
ntt:: Except where noted, it is implied that the
Trane technician is to use this checklist for
inspection/verification of prior tasks
completed by the general contractor at
installation. Use the line item content to
also record the associated values onto the
Trane unitary packaged equipment log.
J
Jo
ob
b N
Na
am
me
e
S
Se
erriia
all #
#
J
Jo
ob
b L
Lo
occa
attiio
on
n
M
Mo
od
de
ell #
#
S
Sa
alle
ess O
Orrd
de
err #
#
S
Sh
hiip
p D
Da
atte
e
U
Un
niitt D
DL
L #
# ((ssp
pe
ecciia
all u
un
niittss))
D
Da
atte
e
S
Stta
arrttiin
ng
g S
Sa
alle
ess O
Offffiicce
e
T
Te
ecch
hn
niicciia
an
n
Table 59.
Startup checklist for 20–75 ton air-cooled units
Completed?
General Start-up
1
Is adequate access/egress provided?
Yes
No
2
Initial site inspection performed?
Yes
No
3
Unit exterior inspected for damage (dents, bends, missing panels, doors work properly)?
Yes
No
4
Unit clearances adequate to avoid air recirculation?
Yes
No
5
Wear electrical PPE
Yes
No
6
Lockout & tagout unit
Yes
No
7
Verify unit interior is free from debris and obstructions, etc.
Yes
No
8
All unit drain lines and traps are properly installed
Yes
No
9
Remove electrical access panel fastened (9) bolt/screws or open access
Yes
No
10
Verify unit is grounded. Confirm a ground wire is coming from the power source
Yes
No
11
Verify main power feed wire gauge is properly sized for current load
Yes
No
12
Verify all wiring connections are tight
Yes
No
13
Verify all field control wiring for VAV controls are complete
Yes
No
14
Verify all automation and remote controls installed/wired
Yes
No
15
Verify all shipping hardware and plastic covers for compressors have been removed
Yes
No
16
Verify hold down bolts and channels from fan sections removed
Yes
No
17
Fan section isolators checked/adjusted (approximately ¼” gap above shipping block)
Yes
No
18
Verify damper linkages are tight/adjusted and tip seals are in good condition
Yes
No
19
Verify compressor oil levels at proper levels (½ - ¾ high in glass)
Yes
No
20
Compressor discharge service valves and oil valves open/back seated
Yes
No
21
All fan belts tensioned, bearings greased and sheaves in alignment
Yes
No
22
Verify supply and relief fan pulley bolts are tight
Yes
No
23
Verify fans rotate freely
Yes
No
24
Verify refrigerant charge on each circuit
Yes
No
25
Remove lock tag out
Yes
No
26
Wear electrical PPE
Yes
No
27
Verify correct voltage supplied to unit and electrical heaters (see IOM for assistance)
Yes
No
28
Allow compressor crankcase heaters to operate for 8 hours prior to starting the refrigeration system.
Yes
No
29
Verify incoming voltage phase balanced
Yes
No
30
Check the incoming power phase rotation.
Yes
No
31
Verify all fans rotate in proper direction
Yes
No