Pre-Start Check List
Task
Initial
Date
1. Voltage is present and landed at equipment.
2. Gas piping is complete and landed at each component. Inlet gas pressure
to be between 7 in. wg and 14 in. wg.
3. Field installed sensors installed. Refer to
“Factory-Provided Sensors,” p. 54
for list of sensors that may be required.
4. Control wiring installed and landed.
5. Accessories installed.
6. Ductwork installed (all runs in place, final tie in complete).
7. Drain lines installed and properly terminated.
8. Startup appointment with Horizon certified Trane service technician set and
confirmed.
Notes:
•
Check list must be completed and returned to Trane before startup is scheduled.
•
Startup must be performed by a Horizon-certified Trane technician with Tracer™ TU program.
•
Contractor to furnish access to equipment (ladder, lift, or roof access).
Summary of Contents for Horizon OABE/F
Page 32: ...Unit Clearances Curb Dimensions and Dimensional Data 32 OAU SVX004D EN ...
Page 37: ...Unit Weight and Rigging OAU SVX004D EN 37 ...
Page 55: ...Installation OAU SVX004D EN 55 ...
Page 78: ...Performance Data 78 OAU SVX004D EN ...
Page 84: ...Appendix 84 OAU SVX004D EN Figure 79 BAYSENS036A installation instructions ...
Page 85: ...Appendix OAU SVX004D EN 85 Figure 80 VELCON 0351 installation instructions ...
Page 89: ...Appendix OAU SVX004D EN 89 ...
Page 90: ......
Page 91: ......