Installation
N
No
otte
e:: Refer to all dimensional data within the manuals equipped with your unit.
Single Furnace Units
Single furnace units (capacities 10-40) consist of a furnace section and an air handler section
mounted on a common base rail.
Multiple Furnace Units
Multiple furnace units consist of two sections: a furnace section with two duct furnaces
(capacities 50-80) or three duct furnaces (capacity 12) mounted on a common base rail; and a
separate air handler section mounted on its own base rail. A flexible connector kit is also
equipped with your unit. Each section has a label with Order No., Model No., Unit No., and Part
No. marked on it. Make certain that the order, model, and part numbers agree on each section to
be connected together. The two sections should be moved individually and mounted in their
permanent location (see “Suspension/Rigging” sections). Ensure that both flange assemblies are
in alignment with a 5" (127mm) space between the flange assemblies. See the following
instructions for installation of the flexible connector kit between the two sections.
Installing Flexible Connector
N
No
otte
e:: Refer to
,
,
.
1. Make sure that the furnace section and the air handler section are in alignment and installed
with a 5" (127mm) space between the flange assemblies.
2. Remove the top extension panel of the duct furnace for access to the inside bottom flange
assemblies.
3. Measure flexible connector in the flat to confirm that it is correct for the unit being installed.
Refer to the Flexible Connector Kit Table following step #9. Make a 90 degree bend 4"
(102mm) from one end of the flexible duct connector.
4. Measure the distance from the top of the flange assembly to the slot at the bottom of the
flange assembly. Make a second 90 degree bend at the measured distance from the first bend
in the flexible duct connector.
5. Slide the flexible connector through the slots in the flange assemblies until the vertical part is
tight against the sides of the flange assemblies.
6. Bend second vertical section up around the flanges. Make sure all bends are straight and
even for proper fit.
7. Bend down top section of flexible connector. Cut metal parts of flexible connector to overlap
the 4 inch section by at least 1-1/2 inches (38mm), but cut the fabric portion 1-1/2 inches
longer than the metal.
8. Screw metal portions of flexible connector to the flange assemblies using drill screws. Space
the screws approximately 4 to 6" (102 to 152mm) on center. Fasten the bottom section in
place by screwing down from the inside. Fasten the overlapped area with two screws in the
metal on each side of the fabric. Seal the fabric joint with RTV sealer and allow to cure.
Replace and reseal top extension panel on furnace section.
9. Apply sealing tape to seams between flanges and flexible connector and to vertical flange
connections. Test for air leaks during initial start-up. Reseal as required.
Table 1. Flexible Connector Kit
Unit Capacity
(Approx.) Straight Length Flexible Connector
Required
50
102 Inch (2.59m)
60
114 Inch (2.90m)
Summary of Contents for GXAA
Page 16: ...16 MUA SVX006B EN Figure 7 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 17: ...MUA SVX006B EN 17 Figure 8 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 18: ...18 MUA SVX006B EN Figure 9 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 48: ...48 MUA SVX006B EN Dimensional Data Arrangements Indoor Arrangement A Capacity 50 80...
Page 55: ...MUA SVX006B EN 55 Motor Electric Data Table 4 Full Load Current in Amperes...
Page 58: ...58 MUA SVX006B EN Coil Cabinet Dimensional Data Figure 25 Coil Cabinet Dimensional Data...
Page 62: ...62 MUA SVX006B EN Gas Equipment Start Up...