MUA-SVX004B-EN
21
Gas Connections
All gas piping should be installed in accordance with local codes. It is required that a ground
union be installed adjacent to the manifold for easy servicing. On vertical runs, a drip leg should
be provided upstream of the control manifold (See
). An additional shut-off must
be located externally of the jacket enclosure where required by local code. The location of this
valve must comply with the local codes. A 1/8 inch NPT plugged tapping, accessible for test
gauge connection, must be installed immediately upstream of the gas supply connection to the
unit. Field gas piping recommendations are shown in
.
W
WA
AR
RN
NIIN
NG
G
E
Ex
xp
pllo
ossiio
on
n H
Ha
azza
arrd
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w ssa
affe
e lle
ea
akk tte
esstt p
prro
occe
ed
du
urre
ess b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y o
orr
e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--o
on
nlly
y--d
da
am
ma
ag
ge
e..
N
Ne
ev
ve
err u
usse
e a
an
n o
op
pe
en
n fflla
am
me
e tto
o d
de
ette
ecctt g
ga
ass lle
ea
akkss.. U
Usse
e a
a lle
ea
akk tte
esstt sso
ollu
uttiio
on
n ffo
orr lle
ea
akk tte
essttiin
ng
g..
It is recommended that the gas piping not be installed through the bottom of the duct furnace
bottom panel. If piping must penetrate the duct furnace bottom panel, it must be sealed to
prevent water leakage.
W
WA
AR
RN
NIIN
NG
G
F
Fiirre
e H
Ha
azza
arrd
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n d
da
am
ma
ag
ge
e tto
o tth
he
e u
un
niitt g
ga
ass v
va
allv
ve
e a
an
nd
d
cca
au
usse
e a
a ffiirre
e h
ha
azza
arrd
d w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
••
D
Do
o N
NO
OT
T cco
on
nn
ne
ecctt g
ga
ass p
piip
piin
ng
g tto
o tth
hiiss u
un
niitt u
un
nttiill a
a ssu
up
pp
plly
y lliin
ne
e p
prre
essssu
urre
e// lle
ea
akk tte
esstt h
ha
ass
b
be
ee
en
n cco
om
mp
plle
ette
ed
d..
••
D
Do
o N
NO
OT
T rre
elly
y o
on
n a
a g
ga
ass ssh
hu
utto
offff v
va
allv
ve
e tto
o iisso
olla
atte
e tth
he
e u
un
niitt w
wh
hiille
e cco
on
nd
du
uccttiin
ng
g g
ga
ass
p
prre
essssu
urre
e//lle
ea
akk tte
essttss.. T
Th
he
esse
e v
va
allv
ve
ess m
ma
ay
y n
no
ott b
be
e cco
om
mp
plle
ette
elly
y ssh
hu
utto
offff,, e
ex
xp
po
ossiin
ng
g tth
he
e u
un
niitt
g
ga
ass v
va
allv
ve
e tto
o e
ex
xcce
essssiiv
ve
e p
prre
essssu
urre
e..
••
D
Do
o n
no
ott o
ov
ve
err--ttiig
gh
htte
en
n tth
he
e iin
nlle
ett g
ga
ass p
piip
piin
ng
g a
att u
un
niitt g
ga
ass v
va
allv
ve
e..
•
The gas line should be supported so that no strain is placed on the unit. Pipe compounds
which are not soluble to liquid petroleum gases should be used on threaded joints.
•
The appliance and its individual shutoff valve must be disconnected from the gas supply
piping system during any pressure testing of that system at test pressure in excess of 1/2 psig
(3.5 kPa).
•
The appliance must be isolated from the gas supply piping system by closing its individual
manual shutoff valve during any pressure testing of the gas supply piping system at test
pressure equal to or less than 1/2 psig (3.5 kPa).
N
No
otte
e:: For additional piping information, refer to the latest edition of the National Fuel Gas Code
ANSI Z233.1 (NFPA 54).