
8
STEP 1
- Carry the unit to the installation location.
STEP 2
- Reassemble by reversing the steps listed in
Section 4 if disassembly was required.
Important:
Under no conditions should metal
strapping be attached to the unit to be used as support
mechanisms for carrying or suspension purposes.
Approved carrying:
1. Hold by the cross members within the cabinet or
unit top plate and use as handles for lifting and
carrying the coil and blower sections.
Cross Member
Unit Top Plate
Section 5. Place Unit at Location
5.1 Carry Unit