Trane CLCH-IN-18A Installation Manual Download Page 1

Part No. X39640529-02

Since the Trane Company has a policy of continuous  product improvement, it reserves the right to change

specifications and designs without notice.  The installation and servicing equipment referred to into this book-

let should be done by qualified experienced technicians.

Installation

CLCH-IN-18A

Library

Service Literature

Product Section

Air Handling

Product

Central Station Air Handlers

Model

T-Series Climate Changer

Literature Type

Installation

Sequence

01

Date

June 1999

File No.

CLCH-IN-18A 6/99

T-Series Climate 
Changer

®

 

Roof Curb

Summary of Contents for CLCH-IN-18A

Page 1: ...lation and servicing equipment referred to into this book let should be done by qualified experienced technicians Installation CLCH IN 18A Library Service Literature Product Section Air Handling Product Central Station Air Handlers Model T Series Climate Changer Literature Type Installation Sequence 01 Date June 1999 File No CLCH IN 18A 6 99 T Series Climate Changer Roof Curb ...

Page 2: ...ii RTWA IOM 1A ...

Page 3: ...ould be supplied by a speciality curb company q Adequate space must be available for maintenance and free air clearances See job site submittals for dimensions q The roof must be capable of adequately supporting the weight of the T Series Climate Changer its accessories and the roof curb Refer to CLCH IM 16 to obtain overall unit weight For roof curbs supplied by Trane the approximate roof curb we...

Page 4: ...oof Curb in Old Construction Figure 6 Typical Installation of Roof Curb in New Construction Auxiliary support Roof mounting curb Inside edge Main roof support member located under center of unit loaded under curbs or auxiliary support or under section joints Main roof support member capable of supporting unit weight AIR FLOW Intake Discharge Piers 4 TYP 2x4 nailer Roof curb Wooden nailer Gasket Na...

Page 5: ... curb provided by Trane NOTE FOR SPECIALTY OR FIELD FABRICATED ROOF CURBS PLEASE SEE THE SECTION ENTITLED SPECIALTY ROOF CURBS FOR IMPORTANT INFORMATION 1 Attach cross brace and outer side splice plates at splice locations Figure 9 Figure 9 Side Splice Detail 2 Attach outer and inner corner splice plates 4 places Figure 10 Figure 10 Corner Splice Detail 3 Tighten nuts bolts at all locations Ensure...

Page 6: ...et along the perimeter of the pipe chase roof curb and the gutter as shown in Figure 13 The gasket for the gutter will run along the flat surface of the gutter which rests on the pipe chase roof curb This may be done before or after placing gasketing along the perimeter of the unit roof curb Gasketing is provided with the roof curb when ordered from Trane Figure 13 Gutter Installation 5 Install th...

Page 7: ...ectively Dimension L is from the outside of the unit roof curb to the outside of the pipe cabinet roof curb Dimension X is the outside to outside width dimension of the pipe cabinet roof curb Dimension Z locates the pipe chase roof curb along the unit roof curb in the direction of airflow This measurement is from the outside of the unit roof curb to the outside of the pipe cabinet roof curb The ba...

Page 8: ...section to get the dimensions Refer to Step 6 of Assembly and Installation Instructions section for more information on installing the gutter piece Figure 18 shows the pipe cabinet and gutter coming together and assembling to the pipe cabinet roof curb Figure 17 Detailed Notching Figure 18 Assembly q Figure 19 shows a right side view and isometric view of a fabricated gutter piece with detailed di...

Page 9: ...y most of the attenuation available from the steel decking In addition special consideration may be required to ensure that the weight of the unit does not crush the roof deck at those points where the deck is between the curb and support joist Poured insulation will usually add the required strength while the use of rigid insulation may require placement of three inch support channels on the deck...

Page 10: ...rn ductwork should be lined internally with glass fiber duct liner 1 thick The external surface of the supply duct should be covered with an acoustical barrier material such as one or two pound sq ft sheet lead 1 64 or 1 32 or loaded vinyl sheet or gypsum board for the first 10 ft of ductwork The lining should extend from the point where the duct penetrates the roof to a distance of 10 ft beyond t...

Reviews: