CVHE-SVN04M-EN
27
Control Panel Removal
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e w
w//C
Ca
ap
pa
acciitto
orrss!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err a
an
nd
d d
diisscch
ha
arrg
ge
e
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss a
an
nd
d d
diisscch
ha
arrg
ge
e a
allll m
mo
otto
orr sstta
arrtt//rru
un
n
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
nn
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. F
Fo
orr v
va
arriia
ab
blle
e
ffrre
eq
qu
ue
en
nccy
y d
drriiv
ve
ess o
orr o
otth
he
err e
en
ne
errg
gy
y sstto
orriin
ng
g
cco
om
mp
po
on
ne
en
nttss p
prro
ov
viid
de
ed
d b
by
y T
Trra
an
ne
e o
orr o
otth
he
errss,, rre
effe
err tto
o
tth
he
e a
ap
pp
prro
op
prriia
atte
e m
ma
an
nu
uffa
accttu
urre
err’’ss lliitte
erra
attu
urre
e ffo
orr
a
allllo
ow
wa
ab
blle
e w
wa
aiittiin
ng
g p
pe
erriio
od
dss ffo
orr d
diisscch
ha
arrg
ge
e o
off
cca
ap
pa
acciitto
orrss.. V
Ve
erriiffy
y w
wiitth
h a
a C
CA
AT
T IIIIII o
orr IIV
V v
vo
ollttm
me
ette
err
rra
atte
ed
d p
pe
err N
NF
FP
PA
A 7
70
0E
E tth
ha
att a
allll cca
ap
pa
acciitto
orrss h
ha
av
ve
e
d
diisscch
ha
arrg
ge
ed
d..
F
Fo
orr a
ad
dd
diittiio
on
na
all iin
nffo
orrm
ma
attiio
on
n rre
eg
ga
arrd
diin
ng
g tth
he
e ssa
affe
e
d
diisscch
ha
arrg
ge
e o
off cca
ap
pa
acciitto
orrss,, sse
ee
e P
PR
RO
OD
D--S
SV
VB
B0
06
6*
*--E
EN
N..
Use the following steps to remove the control panel if
additional horizontal clearance is required.
1. Mark and disconnect incoming wiring to the control
panel.
2. Remove the bolts from the bottom of the panel
which secure the panel to the lower mounting
bracket.
3. Loosen the bolts on the back of the panel which
secure the panel to the top (suction elbow)
mounting bracket. See
.
Figure 18.
Control panel mounting bracket
4. Two people will be needed to lift the panel clear of
the chiller. Refer to
for control panel
weight. Steady the panel as the top retaining bolts
are removed. Then lift the panel clear. Store the
panel in a clean dry area.
5. Use the reverse order to reassemble the control
panel.
Unit-mounted Starter Removal
Additional horizontal and vertical clearances may be
obtained by removing the unit-mounted starter on
chillers so equipped. See
and
.
N
No
otte
e:: Unless otherwise stated, lift only vertically on
starter-provided devices. Refer to all starter-
related manuals prior to lifting. If needed, use a
spreader bar to avoid angles in chains and
reduce required lifting height clearance.
Figure 19.
Unit-mounted starter
Figure 20.
Starter mounting bracket
The following procedure assumes the chiller is new
and has never been installed and therefore there is no
electrical power connected to the chiller. If there is
power to the unit, follow proper lockout/tagout
procedures, and any other applicable safety
regulations regarding electric power.