5
Assembly
5.1 Assembly of casing
5.1.1 Actions before the assembly of casing
If several AHU sections have to be connected, then the procedure after the pre-positioning of the
sections is as follows:
Remove crane lugs
If lifting lugs are mounted, remove them. To set the unit in the exact assembling position, it can be
moved by a rod (leverage).Use the rod only on the base frame profile.
Remove external panels at butt joints
For aligning and connecting the delivery sections, the external panels shall be removed, unless
heat exchanger fittings or similar components prevent this.
Figure 33:
Removable external panels
Procedure:
To remove the external panel - start at the corners - use a screwdriver
– refer to
. After
removing the external panel, remove the insulation.