INSTALLER'S GUIDE

BLK

FACTORY

FIELD

RED

RED

RED

GND

GND (2)

BLK

BLK

STEP 6

 - Route conduit, if used, and wiring to the 

entry point and connect.

1.    Connect field supplied conduit to breaker box. 

STEP 7

 

 -

 Connect high voltage wiring

1.    Connect high voltage field wiring.
2.    Route the three 4-pin connectors, one 3-pin connector, 

and two ground wires through the hole in the top panel.

2.    Reconnect the ground wire coming from the 3-pin con-

nector to the heater base plate front using the screw 
removed earlier.  (See Section 4, Step 1 for illustration)

3.    Reconnect the 3-pin plug on the heater to the 3-pin plug 

in the air handler case.

4.    Reconnect the two ground wires to the lug on the base 

plate.  See illustration in Step 8.

Note: Minimum terminal screw torque is 45 in-lbs.

STEP 8

 

 -

 Plug Connections

1.    Connect the three 4-pin connectors from the circuit 

breakers to the three 4-pin connectors coming from the 
heater.  The connectors are labeled "Circuit1", "Circuit 
2", and "Circuit 3".  Line up the mating male and female 
connectors and connect.

Note: One set of plugs has only two wires each.

2.    Connect the field ground wire to the lug on the heater 

base plate.

Field

ground

Lug

Summary of Contents for BAYEVCC25BK1A

Page 1: ...air conditioning product may result in personal injury and or property damage The manufacturer or seller cannot be responsible for the interpretation of this information nor can it assume any liabilit...

Page 2: ...im mediately 3 Be sure the power supply matches the listing shown on the heater nameplate Section 2 General Information Section 3 Heater Assembly Labeled Heater Baffle Retainer Tab and screw in docum...

Page 3: ...ght front of the heater and connected with a ring terminal to the heater base plate 3 Disconnect the two ground wires from the lug on the heater base plate Note It is recommended that the ducting be a...

Page 4: ...order to comply with National Electric Code NEC Section 240 81 The NEC requires that circuit breakers operated verti cally must be oriented so that the on position of the breaker is upward Field Conne...

Page 5: ...nplug and dispose of pigtail harness Section 5 Install Heater STEP 1 Remove Heater Compartment Panel Heater Compartment Panel 3 Place the circuit breakers back into the control box The tabs on the bre...

Page 6: ...e retainer tab into recess in air handler cabinet 2 Tighten screws to hold tab securely 3 Repeat actions to secure the other tab STEP 5 Select a conduit entry point See the orientations on the followi...

Page 7: ...Page 7 INSTALLER S GUIDE Upflow Route conduit as shown Downflow Route conduit as shown Note A minimum of 8 is required for installation and servicing of the control box 8 Min...

Page 8: ...Page 8 INSTALLER S GUIDE Horizontal Left Route conduit as shown Horizontal Right Route conduit as shown...

Page 9: ...he screw removed earlier See Section 4 Step 1 for illustration 3 Reconnect the 3 pin plug on the heater to the 3 pin plug in the air handler case 4 Reconnect the two ground wires to the lug on the bas...

Page 10: ...Connect the low voltage harness to Electric Heat Con trol as shown Low Voltage Harness STEP 10 Place Wiring Diagram 1 Attach the wiring diagram included in the documenta tion packet to the back of the...

Page 11: ...e branch circuit s shall be sized and protected according to the unit nameplate Table 6 1 BAYEV HEATER DATA Heater Model No Number of Circuits 240 VOLT 208 VOLT Capacity Heater Amps per Circuit Capaci...

Page 12: ...1 electric heat cfm 6 On subsequent calls for W2 and or W3 the EHC will communicate to the AFC the required airflow request and energize the additional relays NOTE The EHC has lead lag logic built in...

Reviews: