General Information
Unit Inspection
To protect against loss due to damage incurred in transit,
perform inspection immediately upon receipt of the unit.
Check carefully for shipping damage. If any damage is
found, report it immediately, and file a claim against the
transportation company.
Exterior Inspection
If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately. Specify
the type and extent of the damage on the bill of lading
before signing. Notify the appropriate sales representative.
Important:
Do not proceed with installation of a damaged
unit without sales representative approval.
•
Inspect the complete exterior for signs of shipping
damages to unit or packing material.
•
Verify that the nameplate data matches the sales order
and bill of lading.
•
Verify that the unit is properly equipped and there are
no material shortages.
•
Verify the power supply complies with the unit
nameplate specifications.
Inspection for Concealed Damage
Inspect the components for concealed damage as soon as
possible after delivery and before it is stored.
If concealed damage is discovered:
•
Notify the carrier’s terminal of the damage immediately
by phone and by mail.
•
Concealed damage must be reported within 15 days.
•
Request an immediate, joint inspection of the damage
with the carrier and consignee.
•
Stop unpacking the unit.
•
Do not remove damaged material from receiving
location.
•
Take photos of the damage, if possible.
•
The owner must provide reasonable evidence that the
damage did not occur after delivery.
Foundation™ Parts List
Item
Description
Qty
2
Damper assembly
1
3
Left side block-off panel: Only for units using the duct
opening closest to the evaporator coil.
1
4
Right side block-off panel
1
5
Intermediate block-off panel
1
6
Extension block-off panel: Only for units using the duct
opening closest to the evaporator coil.
1
7
Left side block-off panel: Only for units using the duct
opening furthest from the evaporator coil.
1
8
Insulated, horizontal block-off panel
1
10
Roll of gasket
1
Installation bag containing:
1
12
Installation guide
1
11
Kit installed label (field installed kit only)
1
9
1-in. x 1-in. x 6-in. gasket
2
–
(#10 screws) ¾ in. long
35
Figure 1.
Parts (field installed kit)
Installation Bag
with Screws
Remove Shipping Screws
Remove Shipping Screws
Remove
Shipping Screws
Remove Shipping Screws
(Securing Blade Damper)