WSHP-SVX10H-EN
29
Start-up
Installing Contractor: Use this form to thoroughly check-out the
system and units before and during start-up. (This form need
not be returned to the factory unless requested during
technical service support).
Job Name:
Model Number:
Date:
Serial Number:
In order to minimize troubleshooting and costly system
failures, complete the following checks and data entries before
the system is put into full operation.
MODE
Heat
Cool
Entering fluid temperature
F
F
Leaving fluid temperature
F
F
Temperature differential
F
F
Return-air temperature DB/WB
F
F
Supply-air temperature DB/WB
F
F
Temperature differential
F
F
Water coil heat exchanger (Water
Pressure IN)
PSIG
PSIG
Water coil heat exchanger (Water
Pressure OUT)
PSIG
PSIG
Pressure Differential
PSIG
PSIG
PSIG
PSIG
PSIG
PSIG
COMPRESSOR
Amps
Volts
Discharge line temperature (after 10
minutes)
F
F