18-AC125D1-1A-EN
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT
— This Document is customer property and is to remain with this unit. Please return to service
information pack upon completion of work.
Condensing Units
These instructions do not cover all variations in systems or provide for every possible contingency to be met in connection with
the installation. Should further information be desired or should particular problems arise which are not covered sufficiently for the
purchaser’s purposes, the matter should be referred to your installing dealer or local distributor.
Note:
The manufacturer recommends installing only approved matched indoor and outdoor systems. All of the manufacture’s split
systems are AHRI rated only with TXV/EEV indoor systems. Some of the benefits of installing approved matched indoor and out-
door split systems are maximum efficiency, optimum performance and the best overall system reliability.
4TTX7
Table of Contents
Section 1. Safety
..................................................................................... 2
Section 2. Unit Location Considerations
............................................. 3
Section 3. Unit Preparation
.................................................................... 5
Section 4. Setting the Unit
..................................................................... 5
Section 5. Refrigerant Line Considerations
......................................... 6
Section 6. Refrigerant Line Routing
..................................................... 8
Section 7. Refrigerant Line Brazing
...................................................... 9
Section 8. Refrigerant Line Leak Check
............................................. 11
Section 9. Evacuation
.......................................................................... 12
Section 10. Service Valves
.................................................................. 12
Section 11. Electrical - Low Voltage
................................................... 13
Section 12. Electrical - High Voltage
.................................................. 15
Section 13. Start Up
.............................................................................. 16
Section 14. System Charge Adjustment
............................................. 17
Section 15. Checkout Procedures
...................................................... 22
Section 16. Refrigerant Circuits
.......................................................... 23
Section 17. Wiring Diagrams
............................................................... 25
Section 18. Pressure Curves
............................................................... 31
Installation and Operation Manual
Summary of Contents for 4TTX7
Page 25: ...18 AC125D1 1A EN 25 Section 17 Wiring Diagrams 2 3 Ton Units...
Page 26: ...26 18 AC125D1 1A EN PRINTED FROM D157615P04 REV A 2 3 Ton Units...
Page 27: ...18 AC125D1 1A EN 27 4 Ton Units...
Page 28: ...28 18 AC125D1 1A EN 4 Ton Units...
Page 29: ...18 AC125D1 1A EN 29 5 Ton Units...