Installer’s Guide

INDOOR THERMOSTAT

SWITCH SETTING

1

1

Fan Switch

TO CHECK

Off

Cool

Heat

Auto

On

COMPONENT OPERATION

Indoor

Outdoor

Compressor

3

 Comp.

Furnace

Blower

Fan

Runs

Sump

Heat

Runs

Runs

Heater

Comes On

Step

No.

CHECKOUT PROCEDURE WITH MAIN POWER DISCONNECTS CLOSED (ON)

1

Also set thermostat dial to call for cooling or heating as necessary.

2

Check only necessary if heating unit is used for indoor section and wiring has been disturbed during installation of cooling equipment.

3

When applicable.

1

Sump Heat

X

X

X

2

Indoor Fan Operation

X

X

X

X

3

Cooling Operation

X

X

X

X

X

X

4

Checking Performance

X

X

X

X

X

X

& Charge

USE CHARTS ATTACHED TO O.D. UNIT

5

Heating 

2

X

X

X

X

X

6

Inform owner on how to operate system and what to expect of it. At the same time deliver Owner’s Use and Care Booklet.

CHECKOUT PROCEDURE

After installation has been completed, it is recommended that the entire system be checked against the following list:

1. Refrigerant Line, Leak checked .................................. [

]

2. Suction Lines and Fittings properly insulated ........... [

]

3. Have all Refrigerant Lines been secured and

isolated properly? ........................................................ [

]

4. Have passages through masonry been sealed?

If mortar is used, prevent mortar from coming
into direct contact with copper tubing ........................ [

]

5. Verify tightness of all electrical connects ................... [

]

6. Observe outdoor fan during on cycle for clearance

and smooth operation .................................................. [

]

7. Indoor coil drain line drains freely. Pour water

into drain pan .............................................................. [

]

8. Supply registers and return grilles open and

unobstructed ................................................................ [

]

9. Return air filter installed ............................................ [

]

10. Thermostat thermometer is accurate. Check

against a reliable thermometer. Adjust per
instructions with thermostat ...................................... [

]

11. Is correct speed tap being used?

(Indoor blower motor) .................................................. [

]

12. Operate complete system in each mode to

insure safe operation. .................................................. [

]

Summary of Contents for 4TTX6

Page 1: ...is hygroscopic action the system should remain sealed whenever possible Never break a vacuum with air and always change the driers when opening the system for component replacement Check for transport...

Page 2: ...o rebend once it has been shaped 3 Determine the best starting point for routing the refrigerant tubing INSIDE OR OUTSIDE THE STRUCTURE 4 Provide a pull thru hole of sufficient size to allow both liqu...

Page 3: ...acuum pump and observe the micron gauge If gauge pressure rises above 500 microns in one 1 minute then evacuation is incomplete or system has a leak 6 If vacuum gauge does not rise above 500 microns i...

Page 4: ...installed in the air han dling device according to the instructions accompanying the air handler and the heaters I START CONTROL Some models have quick start components which are factory installed Fo...

Page 5: ...to Field Hook up Diagrams above 4TTX6 units require 80 airflow with Y1 first stage 100 airflow with Y2 second stage Note A The installer must jumper at the LVTB R to O Note B Cut remove the factory in...

Page 6: ...2 5 8 756 29 3 4 5 8 5 16 143 5 5 8 92 3 5 8 210 8 1 4 79 3 1 8 692 27 1 4 4TTX6036B 4 1064 41 7 8 946 37 1 4 870 34 1 4 3 4 3 8 152 6 98 3 7 8 219 8 5 8 86 3 3 8 730 28 3 4 4TTX6048B 4 1267 49 7 8 94...

Page 7: ...18 AC55D1 4 7 Installer s Guide MOUNTING HOLE LOCATION NOTE ALL DIMENSIONS ARE IN MM INCHES NOTE For model base size see table on page 6 From Dwg D152637 Rev 1...

Page 8: ...X X X 6 Inform owner on how to operate system and what to expect of it At the same time deliver Owner s Use and Care Booklet CHECKOUT PROCEDURE After installation has been completed it is recommended...

Reviews: