background image

18-GL07D1-4

2GN SPLIT INSTALLER’S GUIDE

Figure 1: Typical Split System Application with TAMG Air Handler    

Dual Fuel Systems

2GN Series units can be connected to fossil fuel furnaces that 
include an A-coil or slab coil. Dual fuel installations utilize the 
2GN Series heat pump for heating until the point that auxiliary 
heat is called for on the thermostat. At that point, the furnace 
will be enabled and the heat pump will be disabled. The 
2GN Series heat pump provides air conditioning through the 
furnace’s refrigerant coils.

Refer to the furnace manufacturer’s installation manual for 
the furnace installation, wiring and coil insertion. A dual fuel 
thermostat, a fi eld-installed DPST relay or dual capacity 
auxiliary heat relay is required. See Figure 2 for typical Dual 
Fuel application.

In add-on 2GN Series Split applications, the coil should be 
located in the supply side of the furnace to avoid condensation 
damage to the furnace heat exchanger. A high temperature 
limit should be installed upstream of the coil to de-energize the 
compressor whenever the furnace is operating. Without this 
switch, the 2GN Series Split will trip out on high pressure. A 
dual fuel thermostat can remove the Y1 and Y2 calls when a W 
call is energized to allow gas furnace backup on a 2GN Series 
Split application. Refer to thermostat wiring diagram for details. 

Disconnect

Thermostat

Wire From Furnace

Vibration  Absorbing Pad or Air Pad

P/T Plugs

Wire To

Thermostat

Up-Flow

Fossil Fuel

Furnace

Condensate

Drain

"A" or

Slab Coil

Supply Duct

Air Temperature Limit Switch - 
prevents compressor operation when
entering air is greater than 90°F. 

Water Out

Water In

Lineset To  Air Handler

Insulated

Suction Line

DHW In

Return

Duct

DHW Out

Maximum Recommended Distance

is 60' Between Units

Figure 2: Typical Split System Heat Pump Coil Add-On Fossil Fuel Furnace

Disconnect

Thermostat Wire
From Air Handler

Vibration Absorbing Pad or Air Pad 

P/T Plugs

Water Out

Water In

Lineset To

 Air 

Handler

Insulated Suction Line

Supply

Duct

Wire To

Thermostat

Return

Duct

Condensate Drain

To  Drain

Remote Air Handler

(Maximum Recommended Distance is

60' Between Units)

DHW In

DHW Out

Summary of Contents for 2GN Series

Page 1: ...18 GL07D1 4 IM2503SG4 Geothermal 2GN Series Indoor Split Heat Pump Installer s Guide R 410A Refrigerant 2 3 4 and 5 Tons Dual Capacity T2GN ...

Page 2: ......

Page 3: ...ms 11 Closed Loop Ground Source Systems 13 Hot Water Generator Connections 14 Electrical Data 16 Thermostat Wiring 16 Wiring Schematics 17 Microprocessor Control 18 Operation Logic Data 21 Indoor Split Service Parts List 21 DIP Switch Settings 22 Refrigeration 23 Pressure Temperature Conversion 26 Operating Parameters 27 Pressure Drop 28 Unit Startup 29 Troubleshooting 31 Preventive Maintenance 32...

Page 4: ...6 270 122 291 132 11 05 12 NOTES All units have TXV expansion devices and 1 2 in 12 2 mm and 3 4 in 19 1 mm electrical knockouts Brass service valves are sweat type valves T 2 G N 049 N N R 1 0 C N 1 2 3 4 5 7 8 9 10 11 12 13 14 15 Model T Envirowise Compressor Type 2 Dual Capacity Product Category G Geothermal Product Type N Premium Split System Interior Grade Unit Capacity MBTU s 026 038 049 064...

Page 5: ...inet MODELS HIGH WIDE DEEP WATER IN WATER OUT SERVICE VALVE HWG IN HWG OUT LOW VOLTAGE EXT PUMP LINE VOLTS LIQUID GAS A B C D E F G H J K L M 026 IN 19 50 22 50 26 50 1 93 6 93 8 44 11 55 13 43 16 43 5 87 13 66 15 66 CM 48 90 57 15 67 31 4 90 17 60 21 44 29 34 34 11 41 73 14 91 34 70 39 78 038 064 IN 21 25 25 50 31 50 2 21 7 21 9 21 12 14 15 83 18 83 5 87 13 66 15 66 CM 54 00 57 15 80 01 5 61 18 3...

Page 6: ...oor matching adjustable TXV is factory installed on every coil Fixed orifice or cap tube systems should not be used TAMG air handlers have electronic expansion valves EEV Minimum of two 2 stage cooling blower required Variable speed ECM blower recommended GENERAL INSTALLATION INFORMATION WARNING Safety Considerations Before performing service or maintenance operations on a system turn off main pow...

Page 7: ...ions for the blower coil unit for details on installing the air handling portion of the system All blower coil units air coils must be installed as specified by the manufacturer s installations instructions However the following recommendations should be considered to minimize noise and service problems An air filter must always be installed upstream of the air coil on the return air side of the a...

Page 8: ...mit should be installed upstream of the coil to de energize the compressor whenever the furnace is operating Without this switch the 2GN Series Split will trip out on high pressure A dual fuel thermostat can remove theY1 andY2 calls when a W call is energized to allow gas furnace backup on a 2GN Series Split application Refer to thermostat wiring diagram for details Disconnect Thermostat Wire From...

Page 9: ...the swivel connector prior to attempting any connection The rubber seals are shipped attached to the waterline To make the connection to a ground loop system mate the brass connector supplied in CK4L connector kit against the rubber gasket in the swivel connector and thread the female locking ring onto the pipe threads while maintaining the brass connector in the desired direction Tighten the conn...

Page 10: ...s 0 50 oz per ft for 3 8 in and 1 0 oz per ft for 1 2 in tube 3 After charge is added adjustments can be made to get appropriate subcooling and superheat 4 Longer line sets will reduce capacity and efficiency of the system as well as adversely effect system reliability due to poor oil return 5 Line set sizes match split heat pump Reducing coupling may be required at indoor unit connection UNIT SIZ...

Page 11: ...or pond etc Most local codes forbid the use of sanitary sewer for disposal Consult your local building and zoning departments to ensure compliance in your area Notes For open loop groundwater systems or sytems that do not contain an antifreeze solution set SW2 Switch 2 to the WELL position Refer to the DIP Switch Settings table Slow opening closing solenoid valves type VM are recommended to elimin...

Page 12: ... t s s e L m p p 0 5 0 1 m p p 0 0 2 n a h t s s e L m p p 5 2 1 n a h t s s e L m p p 5 2 1 n a h t s s e L s e t a f l u S m p p 5 n a h t s s e L m p p 5 n a h t s s e L m p p 5 n a h t s s e L e n i r o l h C m p p 0 0 3 n a h t s s e L m p p 5 2 1 n a h t s s e L m p p 0 2 n a h t s s e L s e d i r o l h C m p p 0 5 0 1 m p p 0 5 0 1 m p p 0 5 n a h t s s e L e d i x o i D n o b r a C m p p 0...

Page 13: ...ta in the specification catalog Usually 2 5 to 3 GPM of flow per ton of cooling capacity is recommended in earth loop applications Multiple Units on One Flow Center When two units are connected to one loop pumping system pump control is automatically achieved by connecting the SL terminals on connector P2 in both units with 2 wire thermostat wire These terminals are polarity dependant see Figure 8...

Page 14: ...ertain conditions 2GN Series dual capacity units operate with very low refrigerant discharge temperatures producing little or no water heating capability This scenario occurs when the unit is operating with cold entering source water loop or well Allowing the hot water generator pump to operate during these conditions actually removes heat from the DHW circulating through the unit To overcome this...

Page 15: ...ndicator plug 1 turn on the motor end of the pump until all air is purged from the pump then tighten the plug Use vent couplings to bleed air from the lines 6 Carefully inspect all plumbing for water leaks and correct as required 7 Before restoring electrical supply to the water heater adjust the temperature setting on the tank On tanks with both upper and lower elements the lower element should b...

Page 16: ...chassis The fossil fuel furnace transformer supplies the 24 vac control voltage to the GN Series Split and the fossil fuel furnace MODEL RATED VOLTAGE VOLTAGE MIN MAX COMPRESSOR HWA PUMP FLA EXT LOOP FLA TOTAL UNIT FLA MIN CIRC AMP MAX FUSE HACR MCC RLA LRA LRA 026 208 230 60 1 187 253 18 2 11 6 58 3 21 0 0 4 5 4 17 0 19 9 30 038 208 230 60 1 187 253 23 8 15 2 83 0 30 0 0 4 5 4 20 6 24 4 40 049 20...

Page 17: ...tant L lockout signal 2 This Switch allows the unit to down stage with the t stat when OFF and finish on second stage when ON Thermistor Light emitting diode Green Relay coil Capacitor w bleed resistor Switch Condensate overflow Switch High pressure Switch Low pressure Switch Hot Water On Off Polarized connector Factory Low voltage wiring Factory Line voltage wiring Field low voltage wiring Field ...

Page 18: ...e service calls Diagnostics The TAMG Series control board allows all inputs and outputs to be displayed on the LEDs for fast and simple control board diagnosis Hot Water High Limit Domestic Hot Water Option This mode occurs when the hot water input temperature is at or above 130 F for 30 continuous seconds The DHW limit status LED on the unit illuminates and the hot water pump de energizes Hot wat...

Page 19: ... has expired The ECM blower changes to high speed 15 seconds after the Y2 input 85 of high speed if in dehumidification mode Blower G only The blower starts and operates on low speed Lockout Conditions During lockout mode the appropriate unit and thermostat lockout LEDs will illuminate The compressor loop pump hot water pump and accessory outputs are de energized The blower will continue to run on...

Page 20: ...at and determine the fault SW2 8 in the on position will send a constant signal to the fault indicator in the event of a system lockout condition The LED board on the front of the unit will display all lockouts The following table shows the codes that will be displayed when the System Monitor L is connected to the F terminal of an A TCON802 or 803 Comfort Control A TCON802 AND 803 THERMOSTATS THER...

Page 21: ...D19 16P002D20 16P002D21 16P002D39 Sound Jacket 92P504A16 Power Harness 11P781 01 Solenoid Harness 11P782 02 Refrigeration Components Accumulator 36P509 02 36P509 01 Coax 62I504B01 62I542B01 62I543B01 TXV 33P609 01 33P609 03 33P609 05 33P609 06 Reversing Valve 33P506 04 33P503 05 33P526 04 Filter Dryer 36P500B01 36P500B02 Hot Water Generator Hot Water Generator 62P516 05 62P516 03 Hot Water Generat...

Page 22: ...DIAGNOSTIC INPUTS VIEWED AT LEDS NORMAL DISPLAY VIEWED AT LEDS 7 Output Diagnostics Allows viewing the outputs from the control board such as the compressor reversing valve blower hot water pump and loop pump on the LED display DIAGNOSTIC OUTPUTS VIEWED AT LEDS NORMAL DISPLAY VIEWED AT LEDS 8 Thermostat Selection Configures the control for a pulsed lockout signal ComforTalk and FaultFlash thermost...

Page 23: ...service valve stubs on the outside front of the split cabinet as shown in Figure 13 Nitrogen should be bled through the system at 2 to 3 PSI to prevent oxidation contamination Use a low silver phos copper braze alloy on all brazed connections 2GN Series split units are shipped with a factory charge and service valves are not to be opened until the line set has been leak tested purged and evacuated...

Page 24: ...10 oz should be added to the recommended charge of 82 oz found in the Charge Amount with TAMG Air Handler column for a total charge of 92 oz After initial charge the system should be operated and the system subcooling and superheat verified to the Operating Parameters table If an air handler manufactured by others is used then refrigerant should be added to the 2GN Split factory charge pre charge ...

Page 25: ... line is anticipated 2 Measure the liquid line pressure by attaching refrigerant gauges to the schrader connection on the liquid line service valve 3 Convert the pressure obtained in Step 2 to the saturation temperature by using the Pressure Temperature Conversion Chart for R 410A 4 SubtractthetemperatureinStep1fromthetemperature in Step 3 The difference will be the subcooling value for that unit ...

Page 26: ... 466 128 5 586 146 5 108 35 4 228 78 1 348 106 7 468 128 8 588 146 8 110 36 4 230 78 7 350 107 2 470 129 1 590 147 1 112 37 3 232 79 2 352 107 6 472 129 4 592 147 3 114 38 2 234 79 8 354 108 0 474 129 8 594 147 6 116 39 1 236 80 3 356 108 4 476 130 1 596 147 9 118 40 0 238 80 9 358 108 8 478 130 4 598 148 2 120 40 9 240 81 4 360 109 2 480 130 7 600 148 4 122 41 7 242 81 9 362 109 6 482 131 1 602 1...

Page 27: ...15 2 14 4 9 20 34 70 1 5 140 155 305 355 5 12 2 14 8 12 24 39 3 0 145 160 330 360 7 17 7 15 4 9 24 39 COOLING NO HOT WATER GENERATOR ENTERING WATER TEMP F WATER FLOW GPM TON 2GN026 THRU 2GN064 2GN026 THRU 2GN064 SUCTION PRESSURE PSIG DISCHARGE PRESSURE PSIG SUPER HEAT SUB COOLING WATER TEMP RISE F AIR TEMP DROP F DB 50 1 5 120 140 200 245 7 17 6 14 7 16 19 26 3 0 115 140 195 290 7 15 4 11 8 12 20 ...

Page 28: ... 8 5 0 4 7 4 4 4 1 3 8 10 6 2 5 6 4 8 4 4 4 0 049 Full Load 6 1 2 1 1 1 0 1 0 0 9 9 2 5 2 4 2 2 2 1 1 9 12 3 9 3 7 3 3 3 2 3 0 15 5 7 5 4 4 9 4 7 4 4 049 Part Load 5 1 0 1 0 0 9 0 8 0 8 8 2 2 2 0 1 9 1 8 1 6 11 3 3 3 1 2 9 2 7 2 5 14 4 9 4 7 4 4 4 0 3 8 064 Full Load 8 1 6 1 7 1 4 1 3 1 2 12 3 6 3 4 3 2 3 0 2 8 16 5 7 5 4 5 0 4 7 4 3 20 8 9 8 6 1 9 7 5 6 9 064 Part Load 6 0 8 0 7 0 7 0 7 0 6 10 2 ...

Page 29: ...e fan speed and entering water temperature 8 Decrease the cooling set point several degrees and verify high speed blower operation 9 Adjust the cooling setpoint above the room temperature and verify that the compressor and water valve or loop pumps deactivate 10 Initiate a control signal to place the unit in the heating mode Heating set point must be set above room temperature 11 First stage heati...

Page 30: ...uction temperature here in cooling modes Refrigerant flow Cooling Cycle Analysis COOLING TXV EEV ACTIVE RIGHT TO LEFT ClgTXV EEV Measure liquid line temperature and pressure here in both heating and cooling modes COAX HEATING TXV ACTIVE LEFT TO RIGHT HtgTXV Measure suction temperature here at TXV bulb in heating modes Suct PSI ____ Suct sat temp ____ Volts ____ Amps ____ EWT ____ LWT ____ Suct tem...

Page 31: ...talled and superheat and subcooling numbers calculated If superheat and subcooling are outside recommended ranges an adjustment to the refrigerant charge may be necessary Notes Refrigerant tests must be made with hot water generator turned OFF Verify that air and water flow rates are at proper levels before servicing the refrigerant circuit LED NORMAL DISPLAY MODE DIAGNOSTIC MODES CURRENT FAULT ST...

Page 32: ...hould be inspected monthly under normal operating conditions and be replaced when necessary Units should never be operated without a filter Condensate Drain In areas where airborne bacteria produce a slime in the drain pan it may be necessary to treat chemically to minimize the problem The condensate drain can pick up lint and dirt especially with dirty filters Inspect twice a year to avoid the po...

Reviews: