30
TK 56117-6-OP-EN
Loading and Enroute Inspections
Heat King units provide freeze protection for temperature sensitive cargo.
The unit and the trailer/container should be inspected prior to loading cargo
and while enroute to prevent cargo spoilage.
W
WA
AR
RN
NIIN
NG
G
R
Riisskk o
off IIn
njju
urry
y!!
The unit can start at any time without warning. Press the OFF key on the
HMI control panel and place the microprocessor On/Off switch in the Off
position before inspecting or servicing any part of the unit.
Figure 25.
Pre-Loading Inspection
1.
HK pretrip inspection
2.
Heater air inlet and air outlet not restricted
3.
Sufficient air space around and through the load so air flow is not restricted
4.
Tight trailer/container doors and gaskets with no air leakage
5.
Cargo loaded at proper temperature
6.
Interior/exterior walls and insulation in good condition
7.
Sufficient amount of fuel in tank
8.
Floor channels or “T” flooring in good condition, not clogged or damaged