background image

-- Wide Dual Band Booster (Model: PODRP27)

      

  

  

9

User  Manual

 

You may need longer cables, more than 2 coverage antennas or other items in 

order to fully cover your building. We can make (almost) any cable length and 

can help design a system that fits your application.   

5.4  Isolation and Separation 

Isolation refers to the proper distance or separation needed to keep the Donor 

antenna signal pattern and the Coverage antenna signal pattern away from 

each other.   

Isolation becomes particularly problematic when Omni-directional antennas 

are used for both the Donor and the Coverage antennas. Since these 

antennas transmit in a circle (or more accurately a sphere) it is very easy for 

these spheres to overlap and thus negate the repeater system.   

6  Production Operation 

6.1  Notices 

Follow below safety items carefully before installation, implementation, 

maintenance and operation for this product 

)

 

Repeater amplifies BTS uplink and downlink signal, it can extend BTS 

coverage area in downlink, but also effect BTS receive sensitivities in 

uplink.  

)

 

BS and MS port must be connected to donor antenna and service antenna 

when powers supply on; otherwise the equipment will be damage for long 

term use. 

)

 

When use repeater for outdoor, the distance between donor antenna and 

service antenna must be >20metes, otherwise the repeater will be damage 

because isolation problem for long term use. 

)

 

Donor antenna need to be lighting proof and lighting rod need to be install 

for donor antenna installation pole outside 

)

 

Check input power, require input power less than maximum input power of 

repeater, otherwise the repeater cannot work well. 

)

 

Keep clear for label and indicator on surface of repeater to be identified. 

www.amplificadorcelular.com   PBX (1) 231 9661 Cel 310 309 9002

Summary of Contents for PODRP27

Page 1: ...and Booster Model PODRP27 1 User Manual User Manual 2012 February Wide Dual Band Booster Information in this manual is subject to change without notice www amplificadorcelular com PBX 1 231 9661 Cel 3...

Page 2: ...6 5 1 Minimum Signal Levels 8 5 2 How to check your signal levels 8 5 3 Custom Applications 8 5 4 Isolation and Separation 9 6 Production Operation 9 6 1 Notices 9 6 2 Installation 10 6 3 Commissioni...

Page 3: ...smitted to the BTS via the opposite direction It is commonly used in the area there are two type of mobile network such as GSM CDMA GSM DCS and GSM UMTS It will reduce site deployment cost by using on...

Page 4: ...dB 1 5dB 20 31dB 2dB Band Ripple 4 ALC Scope 20dB Frequency Error 0 05 I O Impedance 50 N connector VSWR 1 5 Noise figure 8 Spurious Emission 36dBm 9KHz 1GHz 30dBm 1 12 75GHz IM3 40dBc Delay 0 5 s Max...

Page 5: ...r board which is controlled by a synthesizer converts the received frequency down to the IF frequency The signal is then filtered by an IF SAW band pass filter and amplified before it is fed to the se...

Page 6: ...st step is 1dB and the adjust scope is 30dB Smart Automatic Level Control ALC to reduce interference to BTS Linear power amplification to effectively suppress inter modulation and spurious emission An...

Page 7: ...a horizontal and vertical beam width of less than 30 to correctly select the donor BTS 4 There is large physical separation between the antennas in order to prevent degradation of signal quality and...

Page 8: ...0dBm 100 105dBm Motorola 80dBm 80 90dBm 90 95dBm 95 100dBm 100 105dBm Simens NONE 70dBm 70 80dBm 80 90dBm 90 100dBm Errison 75dBm 75 85dBm 85 90dBm 90 95dBm 95 105dBm SAGEM 80dBm 80 90dBm 90 95dBm 95...

Page 9: ...low below safety items carefully before installation implementation maintenance and operation for this product Repeater amplifies BTS uplink and downlink signal it can extend BTS coverage area in down...

Page 10: ...ocation where you can also get standard 220VAC power for the repeater Step 4 Place the repeater in that location and connect the coaxial cable to the Donor Side of the repeater and the donor antenna S...

Page 11: ...ower LED Downlink output power is on when finishes commissioning And set UL ATT DL ATT 5dB to balance the downlink and uplink and limited the interference to BTS in uplink direction You can change don...

Reviews: