2
Contents
Section 1. –
Introduction .......................................................................................................... 3
1.1
easy
FLOW-VS
Illustration ................................................................................................. 4
1.2
Unpacking Information ...................................................................................................... 5
1.3
Specifications ................................................................................................................... 6
Section 2. –
Installation ............................................................................................................ 7
2.1
Plan the Installation .......................................................................................................... 7
2.2
Install the optional Injection Tee ........................................................................................ 7
2.3
Fit Tubing into Chemical Drum .......................................................................................... 8
2.4
Fit Tubing to Dosing Pump................................................................................................ 8
2.5
Mount the easy
FLOW-VS
and Make Electrical Connections ............................................. 9
2.6
External Control Settings ................................................................................................ 10
2.7
Setting the Pump Speed to 50% ..................................................................................... 11
Section 3. –
Operating Instructions ....................................................................................... 12
3.1
Manual Operation ........................................................................................................... 12
3.2
External On / Off Control Operation ................................................................................ 12
3.3
External 4-20 mA or 0-1 V Control Operation .................................................................. 12
3.4
External 4-20 mA or 0-1 V Control Operation with Manual OFF Override ....................... 12
3.5
Adjusting the Zero point when using 4-20 mA External Control ....................................... 12
Section 4. –
Peristaltic Dosing Pumps .................................................................................. 13
4.1
Lubricating the Pump Tubing .......................................................................................... 13
4.2
Replacing the Pump Tubing ............................................................................................ 13
Section 5. –
Warranty ............................................................................................................. 15
Section 6. –
Drilling Template ................................................................................................ 17