28
Appendix C: Field Sensor Replacement (continued)
8. Connect the hoses to the sensor. (see picture below)
9. Repeat steps 5 through 8 for the remaining sensor.
10. Install the back panel onto the front panel and tighten the four screws.
Reattach the rubber end caps by pressing them on. Note that one cap has a
hole in it and must line up with the exhaust hole on the side of the DC710.
11. Wait 24 hours prior to starting the analyzer. Make sure battery is charged or
leave the DC710 on the charger so the sensors are under power. During this
time the sensor calibration data will be transferred and the sensor will have
power applied to enable it to acclimate.
NOTE: YOU MUST WAIT 24 HOURS AFTER SENSOR INSTALLATION BEFORE
TURNING YOUR ANALYZER ON AND USING IT FOR THE FIRST TIME.
FAILURE TO DO SO WILL RESULT IN AN ERROR CODE DISPLAYED AND
THE ANALYZER WILL NOT FUNCTION PROPERLY.
NOTE: FACTORY CALIBRATION ONCE PER YEAR IS STILL RECOMMENDED TO
ENSURE PROPER OPERATION AND ACCURACY OF ALL FUNCTIONS
AND RANGES.
Hoses connected to smart sensor.
Summary of Contents for DC710
Page 1: ...DC710 Flue Gas Analyzer The Value LeaderTM www tpi thevalueleader com ...
Page 34: ...Notes ...
Page 35: ...Notes ...