1. PREPARATIONS FOR INTRODUCING THE MACHINE
58
1.4.4
Piping
[ 1 ] Compressor room
(1) Always mount a bypass at the filter position. This allows you to change the filter element without stopping
the compressor.
(2) When using an oil injection compressor “OSP type”, mount differential pressure gauges before and after
the oil removing filter for early detection of a clogged filter.
(3) Be sure to provide a drain port at a pipe rising portion.
[ 2 ] Weaving room
(1) The main pipe in the weaving room should be looped. Connect the main pipe and each weaving machine
with a branch pipe.
Layout and Piping Example for 48 JAT710 Looms