11
3.
Check the water lever, and fill the cooled-water full.
4.
Check the fan strap's degree of tightness
5.
Set the main switch to OFF.
6.
Turn the engine start key to START position.
7.
Warm-up time is about 3-5 minutes.
8.
Speed controller has adjusted well before transporting. So don't adjust it at random, or it will
cause the engine rotation speed too high or too low.
9.
The battery is optional for generator, to install right battery according with the generator before
start.
5. STARTING-UP & RUNNING PROCEDURE
1.
According to the step of 1-10, finish the starting-up procedure.
2.
Ensure voltmeter indicates normal, (single phase: 230V, three phase: 380V)
3.
Set the main switch to ON.
4.
Observe the voltage is in the normal loaded range.
5.
Preheat generator three minute without load after the set starting, then running with load
6.
The new generator set have a running-in period, the period is the initial 20
hours, only with 50% load during the running-in period, or it will shorten the set life.
7.
Checks during the running
1) Whether there is abnormal sound or vibration;
2) Whether the engine misfires or runs rough;
3) Check the color of the exhaust. (Is it black or too white?)
If you notice any of the above-mentioned phenomenon happened, stop the engine
and find out the fault cause or contact with our agents.
If the engine has been running, the muffler will be very hot. Be careful not to touch the
muffler.
The diesel is adopted in the explosive motor. Never fill the diesel which is inflammable
when the generator is working. Be careful to fill fuel and prevent fuel overflowing. Wipe up
the overflowing fuel immediately. Flame and fire are forbidden near the generator.
8.
Load
Do not start 2 or more machines simultaneously. Start them one by one.
Summary of Contents for TDWG12000CXE-N
Page 1: ...1 ...
Page 13: ...13 7 THE FUNCTIONS OF THE DIGITAL PANEL OPERATION PANEL ...
Page 17: ...17 9 MALFUNCTION AND COUNTERMEASURES 1 Maintenance Schedule ...
Page 20: ...20 2 Judge and eliminate trouble ...
Page 21: ...21 ...
Page 22: ...22 Controller Troubleshooting ...
Page 23: ...23 11 ELECTRICAL DIAGRAM 1 Single Phase TDWG12000CXE N TDWG12000SGE N ...
Page 24: ...24 2 Three Phase TDWG12000CXE3 N TDWG12000CXE3D N TDWG12000SGE3 N TDWG12000SGE3D N ...
Page 44: ...44 11 DIAGRAMA ELÉTRICO 11 1 Monofásico TDWG12000CXE N TDWG12000SGE N ...
Page 45: ...45 11 2 Trifásico TDWG12000CXE3 N TDWG12000CXE3D N TDWG12000SGE3 N TDWG12000SGE3D N ...
Page 56: ...56 PANEL DE OPERACIONES ...
Page 59: ...59 9 M ALFUNCIONES Y COMO CONTRARESTARLAS ...
Page 60: ...60 ...
Page 62: ...62 2 Chequee y elimine problemas ...
Page 63: ...63 ...
Page 64: ...64 Problemas con el controlador 11 DIAGRAMA DE CABLEADO ELECTRICO 11 1 Monofásico ...
Page 65: ...65 TDWG12000CXE N TDWG12000SGE N 11 2 Trifásico ...
Page 72: ...72 ...
Page 73: ...73 TY_TDWG12000CX SG_MA_R00 ...
Page 74: ...74 ...