
Installation
42
TOX_Manual_Powerpackage_line-Q_en
6.3.10
Installing tool coupling (ZWK)
Fig. 8
Installing tool coupling (ZWK)
Material required:
Tool coupling (ZWK)
Screw locking compound - low-strength (e.g. Loctite 222)
Food grade grease (e.g. UH1 14-151)
ü
Technical data, dimensions are observed.
See data sheet, or type sheet at
https://www.tox-pressotechnik.com
.
1.
Install the tool holding fixture on the thread of the working piston. Ob-
serve tightening torques.
See
Chap. 4.3 Tightening torques, Page 21
.
2.
Secure the tool holding fixture screw locking compound.
3.
Wet the contact surface between the holding tray and tool holding fix-
ture with food grade grease.
4.
Install the holding tray on the ram or on the tool plate.
Summary of Contents for Powerpackage Q Series
Page 2: ...2 TOX_Manual_Powerpackage_line Q_en ...
Page 24: ...Technical data 24 TOX_Manual_Powerpackage_line Q_en ...
Page 54: ...Troubleshooting 54 TOX_Manual_Powerpackage_line Q_en ...
Page 56: ...Maintenance table of Powerpackage 56 TOX_Manual_Powerpackage_line Q_en ...
Page 66: ...Maintenance 66 TOX_Manual_Powerpackage_line Q_en ...
Page 68: ...Repairs 68 TOX_Manual_Powerpackage_line Q_en ...
Page 72: ...Disassembly and Disposal 72 TOX_Manual_Powerpackage_line Q_en ...
Page 74: ...Appendices 74 TOX_Manual_Powerpackage_line Q_en ...
Page 75: ......
Page 76: ......