Meaning of the indications
This operation must be conducted by a contractor.
Operation that must be checked.
Indicates the work flow.
Building a base for the bathtub
B-11
B-8
B-6
B-7
1
H=100~120 mm
Waterproof
Tile
L=700~800 mm
Please conduct site operation directly on the drain.
When embedding a power cable for the bathtub on the installation side, please
use a sheath tube with an inner diameter of 20 mm or more.