Central remote controller
Owner’s Manual
19
-EN
Set the first day of the week to be displayed in the “Weekly display”, “Weekly Schedule”, and other screens of the Operating
Schedule.
Example: Operating Sch settings and “Weekly display” screen
Changing the First Day of the Week (First Day)
1
In the “Settings Menu” screen, select “Schedule settings” and
then press [
] (Confirm).
The “Schedule settings” screen is displayed.
2
Select “First day” using [
∧
] and [
∨
], and then press [ ]
(Confirm).
The “First day” screen is displayed.
3
Select a day of the week using [
∧
] and [
∨
], and then press [ ]
(Confirm).
The selected day of the week is set.
• If you press [
] (Return), the “Schedule settings” screen is
displayed again.
• By default, “Sunday” is set.
First day