
Appendix
Appendix-4
4. Cord heater installation work procedure
No.
Photo / Explanatory diagram
Procedure
1
Remove each cabinet, inverter assembly, motor base assembly, and partition board assembly.
* Do not damage the electric parts such as cables, connectors, etc. while this work.
Remove the upper cabinet and the valve cover.
Related parts / Screws list
Used screw
Part name
Screw type
Quantity
Upper cabinet
Ø4 × 8
5
Valve cover
Ø4 × 1
1
1-1
Remove the front cabinet, the wiring cover and the
water-proof cover.
Related parts / Screws list
Used screw
Part name
Screw type
Quantity
Front cabinet
Ø4 × 8
7
Wiring cover
Ø4 × 8
2
1-2
Remove the side cabinet (R/L) and the inverter
assembly.
Related parts / Screws list
Used screw
Part name
Screw type
Quantity
Side cabinet (R)
Ø4 × 8
7
Side cabinet (L)
Ø4 × 8
3
Inverter assembly
Ø4 × 8
1
1-3
Remove the inverter assembly.
No. Part name
Connector No.
Connector color
1 TE
sensor
CN600
White
2 TD
sensor
CN601
White
3 TO
sensor
CN602
White
4 TS
sensor
CN603
White
5 4-way valve
coil
CN701 Yellow
6 PMV
coil
CN700
White
7 Fan
motor
CN300
White
8 Compressor
lead
(Intermediate connector)
White
9 Reactor
(2 pieces.)
(Intermediate connector)
White
1-4
Upper cabinet
Valve cover
Wiring cover
Water-proof
cover
Front cabinet
Side cabinet (L)
Side cabinet (R)
Inverter assembly
Summary of Contents for RAS-B10EKVP-E
Page 120: ... 120 Outdoor unit main PCB MCC 5009 ...
Page 121: ... 121 Outdoor unit Sub PCB MCC 5009 ...
Page 136: ......