6
P9 ASD Installation and Operation Manual
Power Connections Precautions
C O N T A C T W I T H E N E R G I Z E D W I R I N G W I L L C A U S E
S E V E R E I N J U R Y O R L O S S O F L I F E .
•
Turn off and lock-out/tag-out all power sources before proceeding to connect the power wiring to
the equipment.
•
After ensuring that all power sources are turned off and isolated in accordance with established
lock-out/tag-out procedures, connect the 3-phase power source wiring of the correct voltage to the
correct input terminals and connect the output terminals to a motor of the correct voltage and type
for the application (refer to the NEC Article 300 – Wiring Methods and Article 310 – Conductors
For General Wiring). Size the branch circuit conductors in accordance with the NEC Table 310.16.
•
Ensure that the 3-phase input power is
NOT
connected to the output of the ASD. This will damage
the ASD and may cause injury to personnel.
•
DO NOT
connect resistors across terminals PA – PC or PO – PC. This may cause a fire.
•
Ensure the correct phase sequence and the desired direction of motor rotation in the
Bypass
mode
(if applicable).
Protection
•
Ensure that primary protection exists for the input wiring to the equipment. This protection must be
able to interrupt the available fault current from the power line. The equipment may or may not be
equipped with an input disconnect (option).
•
All cable entry openings must be sealed to reduce the risk of entry by vermin and to allow for
maximum cooling efficiency.
•
External dynamic braking resistors must be thermally protected.
•
It is the responsibility of the ASD installer/maintenance personnel to set up the
Emergency Off
braking system of the ASD. The function of the
Emergency Off
braking function is to remove
output power from the ASD in the event of an emergency. A supplemental braking system may also
be engaged in the event of an emergency.
For additional information on braking systems, see
.
Note:
A supplemental emergency stopping system should be used with the ASD. Emergency
stopping should not be a task of the ASD alone.
•
Follow all warnings and precautions, and
DO NOT
exceed equipment ratings.
DANGER
Summary of Contents for P9
Page 2: ......
Page 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Page 4: ......
Page 305: ......