HX7+ ASD Installation and Operation Manual
37
Startup and Test
Perform the following checks before turning on the unit:
•
L1/R
,
L2/S
, and
L3/T
are connected to the 3-phase input power.
•
T1/U
,
T2/V
, and
T3/W
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.
Save User Settings
Use the following table to record any changed parameters for future reference.
Table 11. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utility Parameters
Type Reset
.
Summary of Contents for HX7+ ASD
Page 2: ...DN 67017 001 February 2014 HX7 ASD Installation Operation Manual ...
Page 227: ...218 HX7 ASD Installation and Operation Manual Figure 35 200 kVA Sine Wave NEMA 1 Enclosure ...
Page 231: ...222 HX7 ASD Installation and Operation Manual Figure 39 200 kVA Sine Wave NEMA 3R Enclosure ...
Page 235: ...226 HX7 ASD Installation and Operation Manual Figure 43 66 163 kVA 18 Pulse Enclosure ...
Page 236: ...HX7 ASD Installation and Operation Manual 227 Figure 44 200 kVA 18 Pulse Enclosure ...
Page 237: ...228 HX7 ASD Installation and Operation Manual Figure 45 260 518 kVA 18 Pulse Enclosure ...
Page 238: ...HX7 ASD Installation and Operation Manual 229 Figure 46 518 700 kVA 18 Pulse Enclosure ...