
9
© 2015 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2008A/2508A/3008A/3508A/4508A/5008A
REPLACEMENT OF PC BOARDS/HDD
9 - 9
9.1.7
FRAM <for SYS board>
9.1.8
Main memory (DIMM)
Notes:
•
When the SYS board or main memory has been replaced, be sure to perform the calibration
of memory.
•
When performing the calibration of memory, press the [ENERGY SAVER] button and turn the
power ON.
•
When the equipment is started up normally, the calibration has been completed.
•
If the calibration is not performed, the equipment may be not started up normally.
(1)
Remove the rear cover.
(2)
Remove the HDD unit.
P. 9-4 "9.1.3 Hard disk (HDD)"
(3)
Remove the FRAM [2] from the SYS board
[1].
Notes:
•
Be careful not to damage the FRAM when
removing the FRAM from the SYS board.
•
When installing the FRAM, pay attention
to the orientation. Install the FRAM with
its concave portion up.
Fig. 9-24
(1)
Remove the SYS board cooling fan.
P. 4-100 "4.7.15 SYS/HDD cooling fan
(2)
Remove the HDD unit.
P. 9-4 "9.1.3 Hard disk (HDD)"
(3)
Release 2 latches and remove the main
memory [2] from the SYS board [1].
Fig. 9-25