e-STUDIO2006/2306/2506/2007/2307/2507/2303A/2303AM/2803AM/2309A/2809A
© 2013-2017 TOSHIBA TEC CORPORATION All rights reserved
OUTLINE OF THE MACHINE
3 - 22
3.6.2
Description of Operation
[ 1 ] Warming-up
1. Initialization
Power ON
Heater lamp ON
“Please wait” is displayed
Fan motors ON
Initialization of scanning system
- The CIS unit moves to the home position.
- The CIS unit moves to the peak detection position.
- The LED of CIS is turned ON.
- Peak detection (white color is detected by the shading correction plate)
- The LED of CIS is turned OFF.
- The CIS unit moves to the home position.
“READY” is displayed
2. Pre-running operation (Only when the temperature is at fixed temperature)
The pre-running operation is started when the temperature of the fuser roller surface reaches a
certain temperature.
The main motor is turned ON
- Fuser roller rotated.
- Drum rotated.
Pre-running operation stops after specified time
3. When the surface temperature of the fuser roller becomes sufficient for fusing,
“READY” is displayed
[ 2 ] Ready state (ready for copying)
Buttons on the control panel enabled
When no button is pressed for a certain period of time,
- Set number “1” is displayed. Equipment returns to the normal ready state.