ENGINE
4-7
Toro Z Master G3 3000/5000/6000 Series Service Manual
4
Engine Installation
1. Place the engine approximately 6” above the frame
in the engine bay area.
2. Install the battery ground cable and wiring harness
ground wire to the starter motor bolt (Fig. 241).
Fig. 241
DSCN-0043a
4. Plug the wiring harness plug into the engine wiring
harness plug connector (Fig. 243).
Fig. 243
DSCN-0049a
5. Lower the engine to the frame.
6. Align the four holes of the engine base to the frame
using 4 bolts and Belleville washers. Torque the
bolts to 30 ± 3 ft-lbs. (40.7 ± 4.07 Nm) (Fig. 244).
Fig. 244
DSCN-0055
3. Install red positive cable and red wire to the bottom
of the starter solenoid (Fig. 242).
Fig. 242
DSCN-0050a