![Toro TimeCutter ZD530 Operator'S Manual Download Page 28](http://html1.mh-extra.com/html/toro/timecutter-zd530/timecutter-zd530_operators-manual_1132413028.webp)
Figure 27
1. Rear access panel
3. Frame
2. Fastener
Installing the Engine Hood
1. To install the hood, align the slot in the hood
with the frame and carefully lower it onto the
frame (Figure 28). Make sure the frame seated
correctly in the engine hood groove before
forcing the hood down. Push down gently to
seat the retaining pin. Replace the fasteners
removed previously.
G005886
1
2
3
4
Figure 28
1. Engine hood
3. Frame mating with slot in
the hood.
2. Frame
4. Fastners
2. Install the collection bag; refer to Operation,
page 14.
Lubrication
Greasing the Bearings
Grease the front caster pivots and wheels
(Figure 29).
1. Park the machine on a level surface and
disengage the blade control switch.
2. Move the motion control levers to the brake
position, stop the engine, remove the key, and
wait for all moving parts to stop before leaving
the operating position.
3. Clean the grease fittings (Figure 29 and
Figure 30) with a rag. Make sure to scrape any
paint off of the front of the fitting(s).
Figure 29
1. Front caster tire
Figure 30
4. Connect a grease gun to each fitting (Figure 29
and Figure 30). Pump grease into the fittings
until grease begins to ooze out of the bearings.
5. Wipe up any excess grease.
28
Summary of Contents for TimeCutter ZD530
Page 7: ...Slope Chart 7 ...
Page 49: ...Schematics G005894 Electrical Diagram Rev A 49 ...
Page 50: ......