Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the machine.
Shoulder bolt
2
Wave washer
2
2
Locknut (1/2 inch)
2
Install the ROPS pivot shoulder bolt.
Weight
2
Carriage bolt (3/8 x 1 inch)
4
3
Flange nut (3/8 inch)
4
Install the weights.
Lower support
2
Upper support
1
Left, upper bracket
1
Right, upper bracket
1
Backer plate
2
Carriage bolt (5/16 x 2-1/4 inches)
4
Flange nut (5/16 inch)
8
Plain washer
4
Hex-head bolt (5/16 x 3-1/4 inches)
4
Flange-head bolt (3/8 x 1-1/4 inches)
2
Locknut (3/8 inch)
4
4
Flange-head bolt (5/16 x 1 inch)
2
Install the bagger supports and brackets.
Bag support
1
5
Lock-pin assembly
2
Install the bagger frame.
6
Bags
2
Install the bags.
7
Hitch cover
1
Install the hitch cover.
8
No parts required
–
Remove the existing belt cover, bracket,
and discharge chute.
9
CE Kit
1
Install the CE Kit (for CE machines
only).
Blower pulley
1
Pulley mount
1
Locknut (3/8 inch)
3
Belt-cover bracket
1
Speed nut
1
Carriage bolt (1/4 x 3/4 inch)
2
10
Locknut (1/4 inch)
2
Install the blower-pulley assembly.
Baffle
1
Carriage bolt (5/16 x 7/8 inch)
1
Flange nut (5/16 inch)
1
Carriage bolt (3/8 x 7/8 inch)
2
11
Flange nut (3/8 inch)
2
Install the baffle.
7