
Slope Indicator
G01 1841
Figure 3
This page may be copied for personal use.
1.
To determine the maximum slope you can safely operate the machine on, refer to
Slope Operation (page 5)
. Use the slope
indicator to determine the degree of slope of hills before operating.
Do not operate this machine on a slope greater than that
specified in Slope Operation (page 5).
Fold along the appropriate line to match the recommended slope.
2.
Align this edge with a vertical surface, a tree, building, fence pole, etc.
3.
Example of how to compare slope with folded edge.
7
Summary of Contents for 23210
Page 41: ...Schematics g013418 Electrical Schematic Rev A 41 ...
Page 42: ...g013419 Hydraulic Schematic Rev A 42 ...
Page 43: ...Notes 43 ...