Pre-Maintenance
Procedures
Preparing the Machine for
Maintenance
1.
Park the machine on a level surface.
2.
Shift the transmission lever to the P (P
ARK
)
position.
3.
Raise and empty the cargo bed.
4.
Shut off the engine and remove the key.
5.
Allow the machine to cool before performing
maintenance.
6.
Disconnect the negative (-) battery cable from
the battery post.
Raising the Machine
DANGER
A machine on a jack may be unstable and slip
off the jack, injuring anyone beneath it.
•
Do not start the machine while the machine
is on a jack, as the engine vibration or
wheel movement could cause the machine
to slip off the jack.
•
Always remove the key from the key switch
before getting off the machine.
•
Block the tires when the machine is on a
jack.
When jacking up the front of the machine, always
place a wooden block (or similar material) between
the jack and the machine frame.
The jacking point at the front of the machine is located
at the front frame bottom plate (
g365613
Figure 76
1.
Front jacking point
The jacking point at the rear of the machine is located
at the rear cradle bracket (
).
g365614
Figure 77
1.
Rear jacking point
74
Summary of Contents for 08102
Page 14: ...g361802 Figure 9 14...
Page 21: ...15 Torque the fasteners to the specifications shown in Figure 20 g362077 Figure 20 21...
Page 28: ...g361811 Figure 28 28...
Page 29: ...24 Install the fuel tank cap to the left seat base panel Figure 29 g364835 Figure 29 29...
Page 32: ...g364843 Figure 32 32...
Page 42: ...25 Torque the fasteners to the specifications shown in Figure 52 g364859 Figure 52 42...
Page 48: ...g364831 Figure 59 48...