background image

15 

 

NOTE: 

Every step for pressing button during program must be finished within 1 second to ensure successful 

programming. 

 

 

Setting of the Control Board 

WARNING: Ensure the gate opener is Power Off when you make any adjustment of the gate opener. 

Keep away from the path of the gate during you set the gate opener system in case of the unexpected 

gate moving. Carefully adjust settings to avoid the risk of machine damage and injury or death. Always 

ask the help of professional technician /electrician if you have any question. 

1.

 Check again for completed and correct assembly of your swing gate opener and gate. Plug the Power Cord 

into the nearest AC outlet. The Digital Display on the Control Board will flash with “- -”. The unit is in standby. 

2. Single/Dual Gate Set 

Press and hold the “FUNC” button for more than 4 seconds. The Digital Display will indicate 

P1”. Gate opener 

is on the SINGLE/DUAL Gate setting. Press the “INC” and “DEC” buttons respectively to following modes: 

“01” shown in Digital Display, it is Single Actuator 1 (Gate 1) mode. “10” shown in Digital Display, it is Single 

Actuator 2 (Gate 2) mode. “11” shown in Digital Display, it is Dual actuator mode. 

Press the “FUNC”  button to store the data  when the single or dual gate is chosen. The  Digital  Display  will 

indicate “P2”. Now single/dual gate set is finished.   

(Factory set is “11”)

 

3. Master/Slave Gate Set 

When Digital Display indicates “P2”, the gate opener is on the Master/Slave Gate Setting. Press the “INC” and 

“DEC” Buttons respectively to follow modes: 

“01” shown in Digital Display, which means Gate Opener 1 (right-hand side) as Master one 

“10” shown in Digital Display, which means Gate Opener 2 (left-hand side) as Master one 

Press the “FUNC”  button to store the data  when the master/slave gate is chosen. The  Digital  Display  will 

indicate “P3”. Now Master/Slave Gate Set is finished.   

(Factory set is “01”) 

4.  Set the Open Interval between Master and Slave Gate 

When the Digital Display indicates “P3”, the gate opener is on the Open Interval between Master/Slave Gate 

Setting. 

The open interval can be adjusted by pressing the “INC” and “DEC” Buttons respectively. The Digital Display 

will show “0”-“9”, which indicates the interval time “0” means the Master and Slave gates open simultaneously. 

“1” means the Master Gate starts to open 1 second before Slave gate starts to open. Max. open interval is 9 

seconds. Each time you press and release the “INC”  button, the  figure  increases by  1, and  the Master gate 

starts to open 1 more second earlier. Each time you press and release the “DEC” button, the figure decreases 

by 1, and the interval decreases by 1 second. 

(Factory set is 3 seconds) 

Summary of Contents for KD702

Page 1: ...VER 20a KD702 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic ch...

Page 2: ...on for Installation 6 Install the Gate Opener on the Gate 6 Mounting the Control Box 10 Connection of Power Supply 11 Connecting of the Control Board 11 How to Program or Erase the Remote 13 How to Us...

Page 3: ...destrian access shall be located such that persons will not come in contact with the moving vehicular gate 8 Pedestrians should never cross the pathway of a moving gate The gate opener is not acceptab...

Page 4: ...er or other underground utility lines contact underground utility locating companies BEFORE digging SAVE INSTRUCTION 14 Do not permit children to play on or around the gate and keep all controls out o...

Page 5: ...Accessories Parts List Available at TOPENS Store Tools Needed Power Drill Tape Measure Open End Wrenches 14 17 or Adjustable Wrenches Wire Strippers C Clamps small medium and large Level Hacksaw or He...

Page 6: ...ual Single gate running mode Adjustable opening closing interval between master and slave gate Stop in case of obstruction during gate opening Reverse in case of obstruction during gate closing Built...

Page 7: ...stallation Overview Important The second gate opener cable should be put into the PVC conduit not provided which is buried underground This protects the cable from lawn mowers and string trimmers Rev...

Page 8: ...ckets to wooden posts a larger size washer or metal plate should be used between the bolts and the wooden post to ensure the stability of the fastening hardware If the post is smaller than 6 diameter...

Page 9: ...te opener insert the release key and turn the key 90 clockwise This releases the motor and allows the push pull rod to be manually extended and retracted To restore normal operation turn the key 90 co...

Page 10: ...f there is not at least 2 5cm of clearance or if the opener and the Post Pivot Bracket are binding rotate the Post Pivot Bracket and or move the Post Bracket Assembly to obtain the minimum clearance a...

Page 11: ...ach bolt with one 10 washer one 10 lock washer and one 10 nut 9 Attach the gate brackets to each gate by inserting two M10 x 75 bolts through the gate brackets and the drilled holes in the gates Faste...

Page 12: ...of designed for safety reason and a longer service life it is recommended to install the control box inside a secure surface and at least 100 cm 40 inches above the ground to avoid being flooded or bu...

Page 13: ...s from lawn mowers weed eaters and grazing animals 4 The fuse in the control board is interchangeable A 10a 250vac 5 20mm fuse is suitable to the control board Connecting of the Control Board Motor co...

Page 14: ...12...

Page 15: ...rminals in parallel Use another 2 core cable to connect the COM terminal of the receiver to the 15 terminal the NC terminal to the 16 terminal Push Button optional The push button should be wired to t...

Page 16: ...ate opener Every press of the button is able to active the gate opener to work alternately open stop close stop open 2 Use one remote to operate TOPENS swing gate opener sliding gate opener at the sam...

Page 17: ...he single or dual gate is chosen The Digital Display will indicate P2 Now single dual gate set is finished Factory set is 11 3 Master Slave Gate Set When Digital Display indicates P2 the gate opener i...

Page 18: ...h indicates the interval time 0 means the Master and Slave gates close simultaneously 1 means the Slave Gate starts to close 1 second before Master gate starts to close Maximum close interval is 9 sec...

Page 19: ...INC or DEC button the Digital Display will show a 01 99 which indicates the current automatic closing time The minimum time is 1 second 99 seconds maximum Each time you press and release the INC butto...

Page 20: ...n or u respectively When the motor is not running the Digital Display indicates Adjusting the Limit Switch Adjusting the Limit Switch of Actuator 1 The position of Limit Switch A was fixed in factory...

Page 21: ...ection and service should always be performed anytime a malfunction is observed or suspected 2 It is suggested that while at the site voltage readings be taken at the operator Using a Digital Voltmete...

Page 22: ...connections and operation for safety devices 3 Remove the BLUE GREEN YELLOW wires of the arm from the control board and use a jumper wire to short the ULT COM DLT terminals of the control board which...

Page 23: ...21 Quick Setting Guide...

Page 24: ...22...

Page 25: ...23...

Page 26: ...24...

Page 27: ...e do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hour...

Reviews: