25
PREPARATIONS
PREPARATIONS
INSTALLATION
1
Firmly hold the instrument at the position shown below and place it on the automatic instrument
table. For the adjustable instrument table, see "OPTIONAL ACCESSORIES" on page 112.
CONNECTING POWER CABLE
1
Make sure the
switch of the instrument is OFF.
2
Tilt the body slowly so that the
switch is on top and the power inlet at the bottom can
be seen.
CAUTION
• When moving the instrument, two people should lift from the bot-
tom of the device.
One person lifting the device may cause harm to his back or
injury by falling parts. Also, holding areas other than the bottom
and holding the Terminal cover may cause injury, as well as dam-
age to the instrument.
• To prevent damage and injuries, do not install the instrument on
an uneven, unsteady or sloped surface.
• When setting an instrument on an instrument table, pay attention
not to injury a finger between the instrument and the table.
WARNING
Be sure to connect the power plug to an AC 3-pin receptacle
equipped with grounding. Connection with receptacle without
grounding may cause fire and electric shock in case of short-
circuiting.
CAUTION
To avoid electric shocks, do not handle the power plug with wet
fingers.
Holding positions
Holding the instrument
Terminal cover
POWER
POWER
Summary of Contents for TRK-2P
Page 1: ...USER MANUAL AUTO KERATO REFRACTO TONOMETER TRK 2P...
Page 2: ......
Page 116: ......
Page 118: ...AUTO KERATO REFRACTO TONOMETER TRK 2P 41852 97030 Printed in Japan 1311 100LW0...