
Land-leveling
Topcon
AG System Five Operator’s Manual
5-2
Figure 5-1. Adjusting for Soil Compaction
The best approach is to work a small section of the field to learn
just how compact the soil is.
3. Press the Auto button to begin automatic land-leveling, driving
from cut to fill according to the cut and fill map.
Second and Succeeding Day Setups
Before moving the laser transmitter, establish an elevation grade
reference using one of the following methods:
• Level a small section of the field, 50’x50’, to finish grade.
• Use a grade rod to setup a benchmark hub.
If the height of the transmitter remains the same, ensure the Control
Box uses the same elevation setting number from the previous day.
If the height of the transmitter changes, use the finish grade or
benchmark hub as a reference for succeeding day setups.
Amount of
Desired Cut
Additional
0.05 to 0.10 cut
for compaction
Finished Grade
LOOSE GROUND
Amount of
Desired Cut
Additional
0.02 to 0.05 cut
for compaction
Finished Grade
TIGHT GROUND
1
2
3
4
MANU
AL
AU
TO
Sy
ste
m
Fi
ve
AREA OF DETAIL
Summary of Contents for MACHINE CONTROL AG System Five
Page 1: ...AG System Five Operator s Manual MACHINE CONTROL AG ...
Page 2: ......
Page 4: ...CO 175 ...
Page 92: ...Surveying Topcon AG System Five Operator s Manual 4 14 Notes ...
Page 104: ...Safety Precautions Topcon AG System Five Operator s Manual A 4 Notes ...
Page 110: ...Index Topcon AG System Five Operator s Manual Index Notes ...
Page 111: ......