Pre-survey Preparation
GR-5 Operator’s Manual
2-14
7. Select the
Enable Low Power Mode
check box to put the
receiver’s processor into low power consumption mode
(Figure 2-11).
Figure 2-11. Enable and Apply Power Settings
8. Click
Apply
.
Powering the Receiver
When powered from the internal batteries, the receiver constantly
switches from one battery to the other, maintaining a difference of
0.4 V between the batteries.
To check the status of the internal batteries,
view the BATT LED
or check the status using available Topcon software.
• Check the BATT LEDs for battery status.
– A green light indicates greater than 85% charge.
– An orange light indicates an intermediate charge.
– A red light indicates less than 15% charge. Recharge or
replace the battery as soon as possible.
• Do one of the following using PC-CDU:
– Click on
Configuration
Receiver
to view battery voltages
on the
Receiver Configuration
screen.
– Click on
Help
About
to view battery voltages on the
About
PC-CDU
screen.
Summary of Contents for GR-5
Page 1: ... PERATORlS ANUAL ...
Page 2: ......
Page 4: ...ECO 4074 ...
Page 9: ...Table of Contents P N 7010 1004 v WEEE Directive C 2 Appendix D Warranty Terms D 1 Index ...
Page 10: ...Table of Contents GR 5 Operator s Manual Notes vi ...
Page 16: ...Preface GR 5 Operator s Manual Notes xii ...
Page 18: ...Introduction GR 5 Operator s Manual 1 2 Figure 1 1 GR 5 Receiver ...
Page 44: ...Introduction GR 5 Operator s Manual Notes 1 28 ...
Page 99: ...Configuring the Receiver Using TRU P N 7010 1004 3 27 Figure 3 24 Add New Message ...
Page 121: ...MINTER Configuration P N 7010 1004 3 49 Figure 3 42 MINTER Tab ...
Page 122: ...GR 5 Configuration GR 5 Operator s Manual 3 50 ...
Page 170: ...Troubleshooting GR 5 Operator s Manual Notes 6 12 ...
Page 188: ...GR 5 Operator s Manual Notes A 18 ...
Page 192: ...GR 5 Operator s Manual Notes B 4 ...
Page 196: ...GR 5 Operator s Manual Notes D 2 ...
Page 201: ......