
TOMCAR
USA, Inc.
eer Valley Road
Z 85024
Booster to cylinder bolt adjustment
When reinstalling the master cylinder, make sure
there is 1 to 2 mm of clearance between the
master cylinder valve (2) and the booster push-
rod (1).
If adjustment is needed loosen the lock nut (3)
and adjust the pushrod until the rod is flush with
the booster surface. Try fitting the master
cylinder again.
Lock nut – 8mm
Push rod – 6mm
1
3
2
|
1727 E. D
|
Bldg. 2, Ste. 1
|
Phoenix, A
27
06222010-v2.0