ZT-1 User’s Manual – Operation
DOC #18172 Page 26
4) Install Shunt Resistor provided with each load cell, enclosed in calibration data report
plastic cover.
5) Balance the load cell to zero.
•
Adjust the ZERO pot until digital voltmeter shows 0.000 volts.
Note: Measure output voltage with a digital voltmeter across the OUT and COM
terminals (see Figure 13).
6)
•
Set the mode switches to AZ OFF, PRB, PEAK, and ZERO.
Summary of Contents for ZT-1
Page 1: ...ZT 1 Load Module User s Manual For Pre calibrated Load Cells or other Load Cell use Revision A...
Page 2: ...ZT 1 User s Manual Installation DOC 18172 Page 2...
Page 3: ...ZT 1 User s Manual Installation DOC 18172 Page 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...ZT 1 User s Manual Installation DOC 18172 Page 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 9: ...ZT 1 User s Manual Installation DOC 18172 Page 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...ZT 1 User s Manual Installation DOC 18172 Page 14 Figure 4 Strain Gage Sensor Input...
Page 18: ...ZT 1 User s Manual Installation DOC 18172 Page 18 Figure 7 20mA out Sensor Input...
Page 33: ...ZT 1 User s Manual Operation DOC 18172 Page 33 3 Set the OFF PRB switch to PRB...
Page 34: ...ZT 1 User s Manual Operation DOC 18172 Page 34...
Page 36: ...ZT 1 User s Manual Appendix DOC 18172 Page 36 THIS PAGE INTENTIONALLY LEFT BLANK...