172-65510MA-05 (GP Series System Package) 27 Dec 2016
13
Installation and Maintenance Space
Anchoring the Body
Anchor the 4 corners of the base with anchor bolts. Anchor bolts are not supplied with
the system package, so prepare appropriate anchor bolts separately.
GP10L-1AJ:
Anchor Bolt M12
×
4 pcs
Embedment depth of 50 mm (2 in) or more is recommended
GP14L-1AJ: Anchor Bolt M12
×
4 pcs
Embedment depth of 50 mm (2 in) or more is recommended
GP14M-1BJ: Anchor Bolt M12
×
4 pcs
Embedment depth of 50 mm (2 in) or more is recommended
GP10-1CJ:
Anchor Bolt M16
×
4 pcs
Embedment depth of 150 mm (6 in) or more is recommended
GP10-2FJ:
Anchor Bolt M16
×
4 pcs
Embedment depth of 150 mm (6 in) or more is recommended
Refer to the latest drawings for the anchoring positions of each model.
For the latest product information, please contact TLV.
Maintenance Space
The maintenance space shown in the figure below should be provided to enable
disassembly, inspection and replacement of the system package. If there is
insufficient maintenance space, TLV may decline to perform maintenance work.
GP10-1AJ
200 mm (7
3
/
4
in)
400 mm
(15
3
/
4
in)
400 mm
(15
3
/
4
in)
500 mm
(19
11
/
16
in)
GP14L-1AJ
200 mm (7
3
/
4
in)
400 mm
(15
3
/
4
in)
400 mm
(15
3
/
4
in)
500 mm
(19
11
/
16
in)