172-65133M-04 (LA Series) 1 Oct 2021
3
Operation
Principles of air discharge:
1. Start-up Air Discharge
Initially, the X-element is open and air in piping is
quickly vented, significantly shortening equipment
start-up time.
2. Closed Position
When steam flows in, the increased temperature
causes the X-element to close immediately. If the
temperature around the X-element is near steam
saturation temperature, the vent will remain closed.
3. Discharge During Operation
When the temperature of the X-element decreases
due to inflowing air, the X-element contracts opening
the vent and allowing air discharge.
Condensate
Air