background image

Titan Flagpole Installation and Operation Instructions

 

2020 

 

 

How to Install Your Titan Telescoping Flagpole 

 

  

 

     

    

 

 
  
 
 
 
 

                                                         

 

 
 
 
 
 
 

        

      

 

 
 
 
 

Read instructions completely. 
Select the location for your flagpole 
and be sure that there are no 
obstructions; utilities or power 
lines beneath the surface or 
overhead. 

 

 

Tools You Will Need: 

 Shovel, Spade or Post Hole Digger, Tape 

measure, Level, Container to mix concrete. 

Materials You Will Need:  

240lbs of pre-mix concrete, water and 15-

20lbs of Pea Gravel or Crushed Rock 

Install the stop bolt completely 
through the pre-drilled hole in the 
ground sleeve. Hand tighten only. 

Mix the concrete according to the 

manufacturer’s instructions.

 

Dig a round Fence Post Size hole, 
14

” in diameter and 2

8

” deep. A 

larger hole may be required for soft 
or sandy soil. 

 

Be sure that your hole is at least 
the size stated in the previous step. 
Now shovel in 4-6

” of gravel 

into 

the bottom of the hole. This will 
provide water drainage. 

 

 

If you fail to push the sleeve into the 
gravel, it will allow the concrete to 
seal the hole and prevent water 
drainage.

 

Use your “red cap” to cover the 

ground sleeve. Begin to shovel the 
concrete into the hole around the 
ground sleeve being careful not to 
disturb the sleeve position.

 

 

Push the sleeve into the gravel while 
making sure that the ground sleeve is 

at least 1” above ground level. 

 

 

Remove the red cap to check the 
sleeve for plumb with a level in 
several locations. Install the red cap 
into the sleeve to prevent foreign 
objects from entering sleeve. 

After a minimum of 24 hours of 
drying time, take off the red cap, 

place your flagpole into the hole

.

 

 

Reviews: