Titan Flagpole Installation and Operation Instructions
2020
How to Install Your Titan Telescoping Flagpole
Read instructions completely.
Select the location for your flagpole
and be sure that there are no
obstructions; utilities or power
lines beneath the surface or
overhead.
Tools You Will Need:
Shovel, Spade or Post Hole Digger, Tape
measure, Level, Container to mix concrete.
Materials You Will Need:
240lbs of pre-mix concrete, water and 15-
20lbs of Pea Gravel or Crushed Rock
Install the stop bolt completely
through the pre-drilled hole in the
ground sleeve. Hand tighten only.
Mix the concrete according to the
manufacturer’s instructions.
Dig a round Fence Post Size hole,
14
” in diameter and 2
8
” deep. A
larger hole may be required for soft
or sandy soil.
Be sure that your hole is at least
the size stated in the previous step.
Now shovel in 4-6
” of gravel
into
the bottom of the hole. This will
provide water drainage.
If you fail to push the sleeve into the
gravel, it will allow the concrete to
seal the hole and prevent water
drainage.
Use your “red cap” to cover the
ground sleeve. Begin to shovel the
concrete into the hole around the
ground sleeve being careful not to
disturb the sleeve position.
Push the sleeve into the gravel while
making sure that the ground sleeve is
at least 1” above ground level.
Remove the red cap to check the
sleeve for plumb with a level in
several locations. Install the red cap
into the sleeve to prevent foreign
objects from entering sleeve.
After a minimum of 24 hours of
drying time, take off the red cap,
place your flagpole into the hole
.