TPM 053
Version 1.0, May 30, 2017
Page | 19
MODULE INSTALLATION
Gateway Installation and Operation Manual
C
ONFIRMING
G
ATEWAY
M
ODULE
O
PERATION
Once the Gateway module has been mounted and connected to a power supply (i.e. vehicle or battery
power) and Finch display, verify proper operation by the following steps:
1.
Turn on Gateway module by turning on the vehicle electrical accessory power or connecting to a
fully charged battery power source.
2.
Confirm the Gateway module status light is showing a solid light, then flashing at ½ second
intervals after initialization.
NOTE
Once powered up, the boot cycle for the module can take up to 2 minutes.
If the Gateway module is not operating as per the above condition, refer to the Troubleshooting section
of this manual or contact your Titan representative.