TPM 053
Version 1.0, May 30, 2017
Page | 16
MODULE INSTALLATION
Gateway Installation and Operation Manual
b.
Update Finch II firmware if required.
M
ECHANICAL
I
NSTALLATION
WARNING
Ensure the tank is completely drained of liquid and vapour free.
No drilling or welding is to be performed on the tank and frame without first
consulting with the tank manufacturer.
CAUTION
•
Ensure that the vehicle power is turned off before performing any other
work.
•
Install the Gateway module in a non-hazardous location and use rated safety
equipment such as fall restraint, in accordance with facility regulations and
policies.
•
Ensure fuses and components are appropriate for the area classification.
•
Follow all federal, state/provincial and local safety standards and industry
recommended practices for the vehicle. For example, the Federal Motor
Vehicle Safety Standards (FMVSS) and the American Trucking Association
(ATA) Technology and Maintenance Council (TMC) Recommended Practices
(RP).
Choose the Mounting Location (Module and Junction Box)
•
Choose a non-hazardous location
•
Maximum view of sky for best radio reception (module only)
•
Minimize electrical cable length where possible
•
Locate for ease of installation and repair
•
Protected from damage by road debris, trees, stepping or climbing, etc.